Font Size: a A A

Research On The Canceling Water Power Pool Overhaul Management Model Of Shaanxi Ankang Hydropower Plant

Posted on:2009-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:J X HanFull Text:PDF
GTID:2132360272978728Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Electricity is the most important basic energy industry in the economic development. As the renovation of "the second half , competitive pricing," in electricity power and plant ,the relation of power plant and power grids changed from between the interests of "community" to the interests of buyers and sellers "of cubism," which brought operational problems to the plants. The plants became each other's competitors from brothers, have no choice but to tap the latent power stations, in order to reduce wastage and cut cosrs. As the hugely expensive overhaul, the canceling water power pool naturally tap into the latent power plant power plants and become an important means to cut costs and raise competence.This paper introduces the overhaul traditional methods , procedures and processes ankang hydropower plant the canceling water power pool. Points out overhaul of management problems, by using experts enquirer method, this paper get four factors that affect the performance of the canceling water power pool unit overhaul. Using the analytic hierarchy process, the-depth analysis of factors that affect the unit reached overhaul of four key factors : incentive mechanisms, project planning, organizational structure and manage overhaul and risk-control as well as their unreasonable. On this basis, organize and manage overhaul the canceling water power pool by project management approach. The project management model was designed and the emphasis is on how to design a mechanism motivation, how to do project planning and how to build organization structure of overhaul as well as how to identify , evaluate and address the risks Chang the four key factors to improve the performance of the canceling water power pool unit overhaul.The article will divide the canceling water power pool into 4 unit overhaul system, break down each system overhaul tasks, and presents practical experience in the key processes in accordance with the time period and reserves. According to decomposition of overhaul period and the task process and procedures to undertake relations between the logic as well as made overhauling the program network. Finally the forefront of project management methods are used to optimize the traditional project management methods and the units will reduce cost; and achieved remarkable results.It will be a useful exploration for ankang hydropower plant to overhaul the canceling water power pool units by project management method, which also will be of the whole industry useful.
Keywords/Search Tags:The Canceling Water Power Pool, Overhaul, Management Model
PDF Full Text Request
Related items