Font Size: a A A

Research On Delay Analysis And Solutions Of Hydropower Project In Pakistan By OOPP

Posted on:2020-10-19Degree:DoctorType:Dissertation
Country:ChinaCandidate:M T A M O O R A Z A M DeFull Text:PDF
GTID:1482306215477714Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
This research precisely analyses the delay causes of one of the most delayed hydro power project in Pakistan.The frequency and size of this project's cost,causes of time overruns in the context of short historical background mingled with contemporary situation are thoroughly discussed.Timely completion within allocated cost reflects good project management but it has never happened in Pakistan.Delays in construction projects are a common phenomenon in the history of hydro power projects in Pakistan.The socioeconomic problems which are delaying this project(Diamar Basha Dam)which include poor resettlement plan for local people,compensation of land,threat of cultural heritage and ecological impacts of this projects.It gives quantitative analysis by taking into account the most important issues in this project like historical and geographical disputes between local people and Governments,their socioeconomic impacts on affected population due to lack of finance and land use conflicts.The deeper roots behind the excusable delays of construction of the Diamar Basha Dam are discovered in its true spirit while the putative reasons are decorated how this project get into such a predicament and further delay in construction of dam will make it a mirage project.
Keywords/Search Tags:Hydrpower, Project, Diamar Basha Dam, Delay Analysis, Dispute, Compensation, Resettlement
PDF Full Text Request
Related items