| Reservoir engineering construction is an important part of industrial and agricultural construction in our country,is to promote the economic development of our country and improve the level of people’s production and living of necessary measures,for our country’s rapid development provides a great impetus and the comprehensive economic benefits,at the same time,also caused a large number of population migration and resettlement.At present,the resettlement of the reservoir project is an independent discipline which has triggered the research tide in the world,and some related theories and research methods are also rapidly improved and supplemented.Resettlement for reservoir project after project evaluation research,to be able to fully understand the project implementation process and result,timely find problems and summarizes the experience and lessons,to improve the efficiency of the engineering construction and improving the management of the immigration development provide a reference basis,guarantee the stability of the resettlement area society solidarity and coordinated development.The paper mainly adopts the analytic hierarchy process and fuzzy comprehensive evaluation method to evaluate the resettlement project of the dongda longkou reservoir project.First of all,the introduction is elaborated,including research background,purpose significance,research status at home and abroad,research content method and structure arrangement of the thesis.Secondly,this paper reviews the relevant theoretical concepts and research methods of post-resettlement evaluation of reservoir resettlement,and introduces the analytic hierarchy process and fuzzy comprehensive evaluation method.It is also a description of the relocation project and post-evaluation workflow of the dongda longkou reservoir project.Finally the study of neusoft longkou reservoir engineering resettlement project analysis,detailed discusses the analytic hierarchy process(AHP)and fuzzy comprehensive evaluation method is used to determine the evaluation index weight and integrated computation steps after process,and the result analysis.To dongda longkou reservoir engineering resettlement project post-evaluation research,has the following meaning and function: first of all,can comprehensive inspection dongda longkou reservoir project resettlement project implementation effect,summing up experience and lessons;Second to true and accurate reflection of neusoft immigration longkou reservoir project in all aspects of the recovery after resettlement development situation,development direction of late for immigration and provide basis for the establishment of relevant subsidy policy;Immigrants finally can determine dongda longkou reservoir project development and need to improve and strengthen the aspects of the work,to ensure the healthy development of the immigration and improve the management level of people move dongda longkou reservoir project to provide direction for reference. |