Study On Risk Management Of Zihe Road Resettlement Community Project In Mengcheng County

Posted on:2023-04-20Degree:MasterType:Thesis
Country:ChinaCandidate:C LiuFull Text:PDF
GTID:2569307028489274Subject:Project management
Abstract/Summary:PDF Full Text Request
With the economic development and regional expansion of a city,the contradiction between people’s strong demand for improving the quality of living and the current relatively backward urban development is increasingly obvious.Therefore,a large number of old houses and dilapidated buildings demolition,resulting in the corresponding resettlement housing project construction is a key link to improve the quality of urban areas.The risk of resettlement housing project runs through the whole process of the project.There are unpredictable risk factors in all aspects of the project,such as demolition,design,construction,acceptance and residents’ occupancy,such as the risk of capital demand and the risk of engineering construction.If there is no effective identification,analysis and control of the risk factors that may be encountered in the project,it will lead to the mutual influence of various risk factors,the progress of the project is slow,and the project is difficult to carry out smoothly.By taking scientific and reasonable measures to prevent and control the risks of resettlement housing projects,it is beneficial to promote local economic development and maintain social harmony and stability.First of all,this paper expounds the research background and significance.By referring to domestic and foreign literature,it refines and summarizes the historical research on risk management and real estate project management,and puts forward the research content and research methods of this paper.The project and the risk management theory of the resettlement house are introduced in detail,combined with the characteristics of the project,the risk management method suitable for the project is selected.Secondly,as the research object this paper,taking the resettlement community project of Zihe in Mengcheng County,uses the Delphi method to analyze the risk composition of the resettlement housing project,and determines the five main risk factors and fifteen indicator risk factors of the resettlement housing project.Then use the analytic hierarchy process to calculate the importance of risk indicators at all levels,and then further obtain the weight of each indicator risk factor,and in the end,draw a comprehensive evaluation conclusion.It is concluded that the weight value of financial risk is the highest,which should be prevented during the project.Specifically,in policy risk,the law enforcement risk has the highest weight;in construction management risk,the construction safety risk has the highest weight;in financial risk,the fund raising risk has the highest weight;in natural risk,the COVID-19 epidemic risk has the highest weight;and in social risk,the risk in the demolition and resettlement process has the highest weight.Finally,according to the degree of influence of various risk factors on the project,corresponding risk countermeasures are formulated,which lays a foundation for scientific decision-making of resettlement housing projects.
Keywords/Search Tags:resettlement house, risk identification, risk assessment, risk response
PDF Full Text Request
Related items