| In the current process of market resource allocation,investment and financing have become an important part of national governance.The new model of PPP engineering is gradually being valued.In the practice of infrastructure PPP engineering,the sewage treatment plant is an earlier model for introducing social capital to carry out PPP engineering practice in my country.With the introduction of concepts such as Beautiful China,the national team’s emphasis on ecological environment protection has continued to increase,and the demand for sewage treatment plant construction has also increased.However,due to the large investment scale of the PPP project and the long cooperation period,the entire project faces relatively large risks during the development process.Therefore,it is necessary to conduct research on the risks of the PPP project of the sewage treatment plant to lay the foundation for risk response.Based on this,this article defines relevant concepts and theories on the basis of collecting and collating domestic and foreign documents,and then selects the PPP project of the Kuihe Sewage Treatment Plant in Xuzhou City as the case study object.On the basis of introducing its basic situation and characteristics,Identify the risks of the PPP project of the Kuihe Sewage Treatment Plant in Xuzhou City,and finally establish a risk evaluation model based on the identification results.In the overall research process,through risk identification,the risks at this stage are divided into preparatory period risk,construction period risk,and operation risk.There are four categories and 15 sub-categories of risk during the period of time and risk during the handover period.After the overall fuzzy comprehensive evaluation results,it is found that the risk of the project at this stage is at a medium level.Therefore,it is necessary to strengthen risk control and address current risks in a targeted manner.Therefore,based on the classification of risk sharing,specific risk response countermeasures and safeguard measures are proposed to effectively solve the risks faced by the current project and promote the better development of the overall project. |