Font Size: a A A

A Research On The Progress Management Of The Equipment Maintenance Project Of Company A

Posted on:2022-07-14Degree:MasterType:Thesis
Country:ChinaCandidate:L K XuFull Text:PDF
GTID:2512306494495414Subject:Master of Engineering Management
Abstract/Summary:PDF Full Text Request
At present,the social and economic development is rapid,and the demand for safe stability of power systems is continuously improved.For maintenance and replacement of some faults or expiration equipment,small projects have a wide range of project types,many quantities,short-term shortage,and often safety,quality management is more important,and neglect the importance of progress management.Long-term project extension will cause overall equipment failures or increased risk of failure,affecting the security and stability of the system.Through the analysis of a large extension project,it is found that the company has no fine management requirements in project progress management.The division of staff is unclear,the business process is not specific,and the progress plan is formulated and implemented shortage of scientific management,project demand,and the programs lack of precision,site Problems such as large management differences and lack of effective incentive policies.This paper conducted a special analysis for a variety of issues,and the company's small project schedule management system was optimized by the modern project management method.Through the improvement of the improvement of the system,the post division is re-submitted,and the job responsibilities are clarified.According to the refined management requirements,use the ECRS analysis method to combat all the nodes to the end management process,and use the key chain technology to develop the project node plan,reduce the safety time,and promote the completion of each node.Fully consider the details of the project implementation,establish a site standardized control mechanism,reduce the generation of uncontrollable factors.At the same time,the project progress controlled special performance evaluation model is established,and the award mechanism is established,and the project management personnel will urge the project management personnel to actively promote the progress of the project,and ensure that the equipment is put into production,reducing equipment failure,and improving system stability.
Keywords/Search Tags:Progress management, Process optimization, Performance assessment
PDF Full Text Request
Related items