The construction of "Double First-Class" is committed to improving the level of talent training,scientific research and social service in colleges and universities.In order to effectively help the construction and development of "double first-class" in colleges and universities and improve the scientific research level of universities,universities can start from the construction of key discipline research bases,optimize the management process of infrastructure construction projects and improve their own construction ability.The infrastructure construction and management process of colleges and universities is complex and changeable,with many constraints.Based on the status of infrastructure construction management and actual construction characteristics,it studies the goal achievement of construction period,cost,quality and green construction level,analyzes the mutual influence of infrastructure construction projects and constructs the collaborative management system of college construction projects.Generally,the perfect infrastructure project management is the construction period,cost,quality,green construction,and the construction affects each other and restriction,so how to realize the construction period,cost,quality and green construction,optimize the overall management objectives,is the key test of college infrastructure project management ability.The paper takes "double first-class" university construction management as the research background,firstly takes the goal,analyzes the mechanism of internal structure and the construction of collaborative management system.Complex college infrastructure management system is divided into control subsystem of construction period,cost,quality and green construction level of the project,Study the control objectives of each subsystem,The corresponding control method and the synergistic relationship between the construction period control subsystem and the cost,quality and green construction level control subsystem;Then,the Drawing lessons from the system self-organization theory and the project collaborative management principle,Quantifying the functional relationship between the subsystem order parameters,According to the efficacy coefficient of each subsystem on the collaborative project management of complex systems,Build a collaborative management model of university infrastructure projects,Establish the quantitative constraint relationship between subsystem,subsystem,subsystem and the overall system;Finally,the,Using ant colony algorithm to optimize the collaborative management model of college base construction project,Analyzing the basic idea and the overall calculus idea of the ant colony algorithm,And combining with the actual construction situation of the university infrastructure construction projects,The solution steps of the collaborative management model of college project.Taking the construction of the scientific research building of N University as an example,it realizes the establishment of the coordination model,implements the solution process of ant colony algorithm with MATLAB software,and expands the optimization method of the construction management of college construction projects.The innovation point of this article is to build the current educational background of the"double first-class" construction and development of colleges and universities,combined with the specific goals needed by the university construction projects,and the improvement of the construction management level and efficiency of the college construction projects. |