| At present,in the field of water conservancy construction projects,it has become the most common way of commodity transactions for construction units to determine construction units in the form of bidding in my country.With the promulgation of the "Regulations on the Management of Bidding and Bidding for Water Conservancy Construction Projects" in 2001,water conservancy construction projects The bidding activities have been fully promoted.As the basic industry of the national economy,water conservancy is directly related to the life and property safety of thousands of people.As the main construction unit of Dalian water conservancy project,A company’s construction project quality has a huge impact on water conservancy construction in Dalian area.However,in recent years,some problems have been discovered in the process of construction project management of Company A,which are mainly manifested as delays in construction progress,chaotic on-site management,construction not according to plans,and serious anchoring phenomena.These problems have seriously affected the quality of the project and construction progress.The reason is that the bidding management system of Company A is not perfect,the competition of bidding activities is not sufficient,and the function of bidding optimization is not fully utilized.This results in the quality of the winning unit is uneven,and the final construction management is the later stage.Left a hidden danger.Unsolved the above problems,this article uses the literature analysis method,investigation research method,case analysis method and analytic hierarchy process to study the bidding management system of the water conservancy project of A enterprise.This article first analyzes the current situation of the project bidding management of A company,and introduces the organizational structure,department functions,and bidding management process of A company respectively.And on this basis,the problems existing in the bidding management system of A company are analyzed and researched.On this basis,the bidding management system of Company A was optimized.In the process of optimization,the following conclusions can be drawn:(1)A complete bidding evaluation system can select the right bidder more scientifically and rationally;(2)A reasonable organizational structure and division of department functions can improve the efficiency of bidding and give better management to the management staff.Director;(3)Full competition can reduce bidding costs to a certain extent while ensuring that bidders have more choices,and achieve the effect of saving project funds;(4)A sound bidding credit system can effectively regulate bidders’ behavior,To reduce the occurrence of bid-rigging and collusion,and to achieve the goal of fairness and justice in bidding.Based on the principle of "fairness,justice,and selection of the best" as the improvement principle,the improved A company bidding management system can well solve a series of problems existing in the original bidding management system,and the optimized bidding management method can be improved.Good control of the quality,cost and schedule of bidding activities will not only enhance the efficiency of the company’s bidding management,but also reduce bidding costs to a certain extent,and provide guarantee for the quality of later construction.Therefore,the research in this article will help A company improve its project bidding management level,improve its bidding management system,and provide a certain reference for its future water conservancy construction project bidding work. |