| Bidding is an important procurement mode,which is especially widely used in the construction industry.Project quality inspection is a branch of the construction engineering industry.Due to the influence of various local policies,there is a strong block in the industry market.However,with the acceleration of the marketization of project quality inspection industry in various provinces and cities,the proportion of bidding projects in all projects is increasing year by year.Enterprise A is an engineering quality inspection enterprise established in 2007,located in nanjing,jiangsu province.At the beginning of its establishment,by virtue of the strong technical advantages brought by the university background,it has achieved a brilliant performance.However,with the gradual opening of the industry market and the increase of bidding activities,the revenue of enterprise A has shown A declining trend,among which the lack of bidding work is one of the main reasons,which greatly restricts the development of the enterprise.Based on the characteristics of engineering quality inspection industry,this paper makes an in-depth analysis of the current bidding situation of Enterprise A,and points out three main problems in the bidding work of enterprise A: insufficient attention to bidding work;Unreasonable bidding organization structure;Bidding blindly the bid project selection blindly is A enterprise is the key problems in the bidding work aiming at the problems existing in the enterprise put forward the corresponding management measures,and focus on problems,bidding to choose blind by Richard a.enterprise past tender statistical analysis to determine the index system of the project,application of analytic hierarchy process(ahp)to determine the degree of good for the development of the enterprise the competitive power of bidding rival bid project area bidding project type and bid price nature of the bid invitation unit six indicators weights of evaluation.Then,according to the actual situation of enterprise A,two sets of decision-making methods of bidding selection are provided,namely,"efficacy coefficient weighted scoring method" and "merit coefficient judgment method",and puts forward A series of feasible project selection management methods at the same time.Finally,the applicability,operability and accuracy of the above two methods are verified by a practical case. |