Font Size: a A A

Construction Project Bidding Evaluation Methods Improve

Posted on:2013-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q ChenFull Text:PDF
GTID:2242330395473424Subject:Project management
Abstract/Summary:PDF Full Text Request
The project bidding widely recognized by the international community and a commonly used distributions or undertake engineering tasks transactions. China in the early1980s, the progressive introduction of a bidding system, as the system continues to improve, the tender bid evaluation method research has gradually be-come the focus of attention. Principles and methods of bid evaluation factors play a decisive role in this part. The bid evaluation method not only affect the selection results of specific projects and investment returns, but also affected the normal order of the construction market. The current engineering Zhaotoubiaofa law, regulations, mainly on the bid evaluation process, information disclosure, compliance surveys, bid evaluation the scoring should quantify and review records aspects of the regulations, but because of the large number of affected factors, it is difficult to determine its effectiveness. Accurate and objective evaluation of the contractor must have a practical, feasible, fair and impartial evaluation of tenders.Start from the analysis of the status quo of China’s bidding market, this paper introduces the status quo of the bid evaluation methods and the advantages and disadvantages of common:comprehensive evaluation method based on AHP-based value engineering method used in the bid evaluation, proposed a more comprehensive and reasonable, easy to implementbid evaluation methods-improved comprehensive evaluation method. Specific in the determination of the evaluation factors, the introduction of AHP, the effective combination of quantitative and qualitative methods, accurate classification and evaluation of the various weighting factors. The introduction of value engineering evaluation review, the conversion of a large number of qualitative factors in the evaluation index to be considered on quantitative factors, improve the accuracy of the assessment, reducing the impact of human factors. Finally, through the comprehensive assessment of a the bridge bid evaluation instance improved assessment methods to verify the correctness of the improved comprehensive evaluation method, rationality. This study to improve our building construction tender evaluation methods, has a certain reference value.
Keywords/Search Tags:construction project, bid evaluation method, improved comprehensiveevaluation, method of Analytic Hierarchy Process, Value Engineering
PDF Full Text Request
Related items