Font Size: a A A

Electronic Bidding Mode Application Analysis And Research

Posted on:2014-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:S D WangFull Text:PDF
GTID:2232330395999909Subject:Project management
Abstract/Summary:PDF Full Text Request
With China’s promotion of the construction market bidding system, the construction industry in China in various fields continuously improve the competitiveness, and has the strength to participate in international construction activity. The bidding system also requires constantly improve.The law of Chinese contract from1999had provided for the establishment of electronic contracts, a lot of provinces and cities start the traditional paper mode shift to electronic bidding mode, Liaoning Province, Dalian City request all the bidding behavior, are all implemented electronic bidding mode.In this thesis, combined with the various projects I work, from a practical point of view, the bidding process in the electronic mode, and released their investigation to the Dalian Municipal Construction Tenders practitioners questionnaires, collected the electronic mode of bidding problems that have arisen and to analyze the causes of the problem and suggestions for improvement, and finally through the tender documents of the relationship between the project rating and occupation of the tender time, and the use of data analysis, charts and other modalities has led to the weighted coefficient and weighted coefficient percentage.
Keywords/Search Tags:Electronic bidding mode, Advantages and disadvantages of the two modes, weighted coefficient, weighted coefficient percentage
PDF Full Text Request
Related items