| With the rapid development of China’s economy,the deepening of urbanization,and the increasing improvement of people’s living standards,daily activities of the people in the main urban area of Changzhi City are consumed,and the amount of domestic waste generated also increases dramatically.If the indiscriminate disposal capacity is insufficient,the amount of garbage in Changzhi City will increase at a faster rate,which will not only affect people’s daily life,but also hinder the development of the urban economy.Therefore,in order to solve the problem of disposal of domestic garbage in Changzhi City,promote the development of local solid waste industry and enhance the level of urban management,the construction of a waste incineration power plant is an inevitable requirement to achieve the harmless disposal of domestic garbage.This paper uses the theory and method of project schedule management to compile and manage the schedule of the domestic garbage innocuous treatment project in the main urban area of Changzhi city.Through the analysis of the basic situation of the project,the theoretical knowledge of project schedule management is applied to the actual situation.In the project,the purpose of combining theory with practice is achieved.Firstly,the research background and research significance of domestic garbage non-hazardous disposal project in the main urban area of Changzhi City were described.Secondly,the domestic research status of project schedule management was summarized,and comments were made to put forward their own views.Then he also described the related theories of project progress evolution and control,and laid the foundation for the practical application of the theory in the next project.The following is a detailed description of the features,content,organization characteristics and objectives of the project for the innocent treatment of biological and chemical waste in the main urban area of Changzhi City.Next,when compiling the progress plan for the harmless treatment project of domestic garbage in the main urban area of Changzhi City,the task is first to perform WBS work breakdown,and then the logical relationship between the processes is established on the basis of again,and the responsibility distribution of personnel is specified and the process is calculated.The duration of this is based on the preparation of the Gantt chart and the network plan diagram.Afterwards,dynamic monitoring methods are used to analyze the influencing factors affecting the smooth progress of the schedule,and then scientific and effective measures are taken to adjust the schedule so as to adjust the process of deviations so as to ensure that the project schedule can be completed on time.By combining the schedule theory with the harmless treatment of domestic garbage in the main urban area of Changzhi City,we can see that a reasonable schedule is prepared,and that the implementation of the schedule can be dynamically monitored in real time,and dynamic control can be performed.This can be a smooth project.Go ahead and complete the construction goals as scheduled.Through the research on the progress management of the harmless treatment project of domestic garbage in the main urban area of Changzhi City,the method of using progress control and management was proposed to realize the goal of reasonable operation of the harmless treatment project of domestic garbage in the main urban area of Changzhi City,and to make resources The configuration is optimal. |