Font Size: a A A

Research On The Construction Of The Metering Production Scheduling Platform Of The H Province Electric Power Company

Posted on:2021-03-17Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y FengFull Text:PDF
GTID:2432330605455684Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the development of the economy,people's demand for electricity is constantly increasing,and the relatively backward power measurement equipment has caused many difficulties and challenges for power companies.The development of the Internet and automated monitoring technology has provided the possibility of using smart meters.With the large-scale use of smart meters,the workload of power metering verification has greatly increased,and the quality and efficiency of metering verification have been greatly improved after the workload has been greatly improved.Great impact,which brings new challenges to power metering.Under the previous measurement system,the provincial company authorized the cities and counties to perform their own verification.Due to the equipment and personnel quality,the verification results and the verification results of the provincial measurement center are somewhat different.Because the accuracy requirements of smart meters are relatively high,the company 's Management brings great problems.Using information technology to improve the verification efficiency of the provincial metrology center will make a unified verification and unified distribution work mode very necessary.At present,there are many problems in the construction of the company's information system,such as the separation of the management standard and the measurement standard system cannot be consistent,making the work Cumbersome and inefficient,the company's management costs continue to increase,and the measurement results are difficult to meet the management requirements.These problems have greatly hindered the popularization and application of smart meters.This article takes the provincial electric power measurement center of H province as the research object,takes the procurement,acceptance,verification,warehousing,distribution and other processes of measurement instruments as the research content,and combines the relevant theories and technologies of production scheduling and information platform construction.The survey of the current situation of the production dispatch informatization construction of the measurement center of the power company,and a detailed analysis in combination with the production dispatch informatization construction goals and needs,business processes,functional requirements,technical requirements,etc.from the business architecture,application architecture,data architecture,technical architecture The construction plan of the information platform was put forward in other aspects.Finally,according to the relevant theories of project management,the implementation plan and guarantee measures of the information platform platform were proposed from the aspects of time management and risk management.Through the research in this paper,a production scheduling platform for the measurement center with intensive management,complete functions,and information sharing has been established,which has improved the measurement efficiency and accuracy,broken the differences in the verification results due to human and geographical factors,and effectively improved the verification and distribution.Efficiency,the establishment of a standard set of information management process,enhance the power company's ability to control the measurement center,and laid a good foundation for the company to deepen the group operation and intensive development.
Keywords/Search Tags:production scheduling, information platform, scheme, measure
PDF Full Text Request
Related items