Font Size: a A A

Research On Distribution Automation Planning In Luliang City

Posted on:2019-03-16Degree:MasterType:Thesis
Country:ChinaCandidate:S P MuFull Text:PDF
GTID:2432330572463148Subject:Agricultural Extension
Abstract/Summary:PDF Full Text Request
The rapid growth of China's economy has greatly improved people's living standards.In order to meet the needs of urban residents' electricity consumption,the amount of electricity supply needed by the national distribution network is gradually increasing.Therefore,in order to solve the problem of power supply demand,China has begun to strictly require the various indicators in the process of construction of distribution network automation.At the same time,in order to facilitate the operation and management of power supply system,we will connect the substation around the power plant,through the network,to form a whole,signal communication,power transmission and distribution between each other,to form a national or regional network.The operation quality of the power grid is related to the operation of the whole power supply system.After the equipment fails in the transmission and transportation links,the power supply is interrupted.The power system network and its operation characteristics are analyzed through the evaluation of regional power grid.Social development change rapidly,the progress of science and technology leads to various types of work between the mode of communication has a huge impact,from information exchange to the internal coordination between different types of workers,from the bottom to the top of the building development,from a macro to micro research.The research and development work,provides an important basis for the status quo of objective and accurate evaluation of the power grid,the progress has played an important role in the optimization of network structure,which greatly promote the safety and reliability of regional power grid operation,have a great impact on the economic efficiency of enterprises.This paper forecasts of economic development in Lvliang during the period of 13th Five-Year ",concluded that in 2020 GDP and per capita income of urban and rural residents more than ten years ago,a.According to the development of the area economy and the history of electric load forecasting,"13th Five-Year" during the period of power demand and the voltage division network supply load,and provides some constructive solutions.At the same time,the analysis and study of the distribution network in Lvliang area the current construction situation and development results,combined with the construction objectives and requirements of power grid during the 13th Five-Year",this study has its important role to the development of economy and society.
Keywords/Search Tags:Lvliang power grid, power demand, "13th Five-Year" planning, distribution automation,efficiency
PDF Full Text Request
Related items