Font Size: a A A

Research On Operation Environment Risk Management Of CPTF Company's LCD Panel Production Line

Posted on:2019-10-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y G PanFull Text:PDF
GTID:2428330575950564Subject:Project management
Abstract/Summary:PDF Full Text Request
LCD panel production line works as an electronic information industry.Although the hazardous chemicals involved in the production process are small,they are numerous in variety,toxic,and have many sources of pollutants in the production process.The electronic information industry is generally located in residential areas,and the project operation If a sudden environmental risk accident occurs in the process,it will have a significant impact on the surrounding residential areas,which is mainly caused by the severe pollution of the surrounding residential areas and cause human casualties and property losses.The consequences of the accident are more serious.During the operation of the project,appropriate environmental risk control measures should be taken to reduce the probability of accidents.It is important to ensure that environmental risk management during project operation is to prevent the occurrence of environmental risk accidents at the source and avoid environmental pollution accidents during engineering operations.Therefore,it is of great significance to study the environmental risk management of the LCD panel production line.In this paper,based on the actual situation of the CPTF company's LCD panel production line project,a systematic study of the establishment and evaluation of the CPTF company's LCD panel production line operation environment risk management system has been carried out,and the establishment of an environmental risk management system to promote the operation of similar projects has been carried out,and similar projects have been reduced.The environmental risk of the operation process has positive reference value.This article first studied the related theories of risk management and environmental risk management,explained in detail the meaning of environmental risk and environmental risk management,and introduced the method of environmental risk management.Next,this article takes the CPTF company's LCD panel production line project as the research object,and specifically analyzes each evaluation index that has a great influence on the evaluation of the CPTF company's LCD panel production line engineering environmental risk management system,including environmental protection engineering,material storage and transportation engineering,Managerial quality,engineering equipment problems,and management level five evaluation indicators.In order to quantify all major indicators in the environmental risk manaeement svstem.the fourth chapter uses the combination of the analytic hierarchy process and the fuzzy comprehensive evaluation method to evaluate the CPTF company's LCD panel production line engineering operating environment risk management system,and according to The evaluation results put forward effective environmental risk response measures and safeguard measures in order to achieve the goal of reducing the risk of engineering operating environment risks.Finally,the conclusions obtained are summarized,and the future direction of the research is prospected.
Keywords/Search Tags:LCD panel, Production line engineering, Project operation, Environmental Risk Management
PDF Full Text Request
Related items