Font Size: a A A

Research On The Application Of Quality Management In The Construction Of Higher Vocational Training Room

Posted on:2020-03-14Degree:MasterType:Thesis
Country:ChinaCandidate:C LiuFull Text:PDF
GTID:2427330590471459Subject:Project management
Abstract/Summary:PDF Full Text Request
As a kind of higher education,higher vocational education pays more attention to students' practical ability education in the process of cultivating talents.In the "Opinions of the Ministry of Education on Enhancing the Teaching Quality of Higher Vocational Education" promulgated by the Ministry of Education in 2006,it is clearly stated that higher vocational colleges must vigorously promote the integration of work and study and emphasize the cultivation of students' practical ability.At the same time,as society continues to develop and quality management concepts continue to deepen in higher vocational colleges,higher vocational colleges are paying more and more attention to project quality management.As a central financial support project for 2013,the H Vocational College Building Training Center has relatively high construction quality requirements for its subprojects.The BIM simulation training room is the core construction project of the center.In order to ensure the construction quality of the BIM simulation training room,H Higher Vocational College decided to implement project quality management during the construction of the project.The project quality management mainly includes: project quality plan,project quality assurance,project quality control and improvement.During the entire cycle of the construction project of the entire BIM simulation training room,project quality management will play a decisive role in achieving the quality objectives of the project.Based on the research and analysis of the basic situation of BIM simulation training room construction project,this article analyzes the current situation of the quality management of BIM simulation training room project.Develop a quality plan for the project,then monitor the overall quality level of the project's operation process through quality control and evaluation of all aspects of the project,identify quality issues,formulate quality improvement measures,correct quality deviations,and ensure project quality is achieved Quality plan requirements.This article mainly uses case analysis and literature research methods to conduct detailed research and analysis on the construction project of BIM simulation training room.In the process of project operation,the overall plan for project implementation was first formulated,including the quality plan and project risk plan of the project.At the same time,a variety of tools in project quality management are used to analyze the project quality problems,find out the causes of project quality problems,and ensure the achievement of project quality objectives through project quality improvement measures.Secondly,through the project quality management,the entire project implementation process is monitored in a timely,accurate and effective manner,ensuring the smooth implementation of the project operation plan.Through the research and analysis of this case,the project quality management was successfully introduced into the construction of the vocational training room in the Higher Vocational College,which effectively reduced the construction cost of the project,improved the construction quality of the project,and achieved valuable construction experience.It is of great practical significance to provide a mature construction model for similar construction projects in higher vocational colleges in the future.
Keywords/Search Tags:Higher vocational college, Training room construction project, Quality management
PDF Full Text Request
Related items