| At present,China’s social economy shows a new normal,that is,the economy has changed from high-speed growth to medium-high-speed growth,and the economic structure has been optimized and upgraded,from factor-driven and investment-driven to innovation-driven.The construction industry has also shown a "sunset." trend from the former sunrise industry.The cake shrinks,and if you don.The traditional survey and design enterprise have a small market share.If they want to settle down in the construction industry market,they must adapt to the trend of the times and carry out transformation and development.This paper selects the first construction general contract transformation project implemented by ZYCK Survey and Design Company,namely WJ farmer market construction project.To ensure the successful completion of the construction of the project,according to the actual work needs of the author,the project management and risk management methods are used.And the tool puts forward the thinking and discussion on the risk management research of WJ farmer’s market construction project.The full text is based on the research perspective of project risk management,and is divided into seven aspects according to the needs of the research.Firstly,with the background and significance of the thesis,this paper makes a necessary explanation for the research ideas,methods and technical routes.Then it sorts out the risk management theory that may be involved in the research,and summarizes and summarizes the research dynamics at home and abroad,and finds a valuable reference.Then from the perspective of project managenent the general situation of WJ farmer’s market construction project and the status quo of risk management are analyzed,which lays a foundation for the devdopment of follow-up risk management.Then,according to the key steps of project risk management,the risk of WJ farmer’s market construction project was identified by expert survey method,brainstorming method and checklist method,and the risks from construction management,construction risk and safety were identified.Seven dimensions of risk factors such as environmental risk,technical equipment risk,economic risk,natural risk and political risk.Following the estimation of the risk situation of the WJ farmer’s market construction project through qualitative means,the analytic hierarchy process is used to comprehensively evaluate the identified risk factors,through weight calculation and ranking analysis.The risk factors of organizational management risk,construction risk,safety and environmental protection risk are determined to be high among the risk factors of the project;the risk of technical equipment risk and economic risk is moderate,while the risk of natural risk and political risk is low.Secondly,according to the ideas and strategies of risk management,from the perspective of finding solutions to risk management,different project risk response measures are proposed for each factor risk weight,in order to ensure the construction of ZYCK survey and design company in WJ farmer market construction project.Effectively reduce risks and reduce losses during construction and later operations.Finally,the condusions of the full-text study are obtained.In the new market competition environment,we will take advantage of the front-end advantages of the construction industry and continue to break through ourselves to form an integrated operation mode,which will become the only way for the development of survey and design enterprises.The risk management research on the first construction general contracting project implemented by ZYCK Survey and Design Company is not only a guarantee for the smooth implementation of the WJ farmer’s market construction project,but also a useful reference for the subsequent transformation and development of ZYCK survey and design company. |