Font Size: a A A

Research On Project Cost Control System Of CBC Company

Posted on:2021-04-15Degree:MasterType:Thesis
Country:ChinaCandidate:K LiuFull Text:PDF
GTID:2392330602483471Subject:Master of Engineering in the field of project management
Abstract/Summary:PDF Full Text Request
Construction enterprises are facing huge opportunities and challenges.How can construction enterprises survive in the increasingly fierce market competition,In the increasingly competitive construction market,cost has gradually become a key factor affecting the economic benefits of enterprises.How to control the cost,reduce the cost without affecting the quality and carry out effective cost control,so as to pursue the maximum benefit,has become the current construction enterprise Research hotspot.With the rapid development of construction industry in China,the position of pillar industry has been strengthened.This puts forward higher requirements for enterprise in project cost management.Facing the pressure of internal and external competition in the transformation of the construction industry,CBC company is deeply aware that in order to make the enterprise develop healthily and sustainably,accelerate the transformation,and win the core competitiveness in the increasingly fierce competition of the construction market,it is necessary to focus on solving the problem of how the modern construction enterprises manage and control the project cost in the fierce competition market and improve the core of the enterprise Competitiveness to adapt to the transformation and development of the construction industry.It is to improve the quality of enterprise management.Based on the analysis of the current situation of CBC company's cost control,this paper finds that CBC company has some problems in the process of project cost control,such as management fragmentation,deviation in the implementation process,and inadequate incentive system.It also analyzes the necessity of CBC company to establish a project cost control system.Based on the above problems,this paper analyzes the two levels of the company and the project respectively Focusing on six aspects of cost prediction,cost objective,cost control planning,cost control planning,cost accounting analysis and deviation correction,cost performance assessment and evaluation,it is pointed out that the company and project department are the main bodies of cost control,and the main differences between them are reflected in the different division of tasks,CBC company pursues that all members of the company participate in the cost control process of the project;based on the company level,it puts forward that the cost of the project should be controlled through four parts:cost control planning,cost control plan,cost accounting analysis and correction,cost performance assessment and evaluation;at the project level,it is suggested to adopt three aspects of project cost management:target management,responsibility cost management and quality cost management Control theory is used to control the project cost.CBC company puts forward the corresponding optimization design scheme and implementation guarantee measures from the aspects of integrated management of organization and process,informatization means of management informatization platform,establishment of cost control system combining "right","benefit" and "responsibility",encouragement of all employees to participate in cost control and performance evaluation in the whole process,and builds CBC cost control system based on the actual situation of the company This paper introduces the basic guarantee and path of CBC cost control system,and finally puts forward the implementation suggestions and verifies the implementation effect of cost control through the application cases.So that CBC company's project cost can achieve the management and control of the company's full participation,life cycle and all elements.The specific research ideas are:analyze the current situation to find out the research problems-scheme plan-establish the management and control system-Implementation Guarantee-Performance Assessment-case verification-Future Outlook.CBC company shall design and establish a cost management and control system in line with the actual situation of the company,and carry out fine management and control on the cost of the company.Strive to build a set of cost management and control system applicable to actual projects,better serve the cost management and control of the company,and provide reference value for the follow-up scholars'research on cost management and control.
Keywords/Search Tags:project cost, project cost control, project cost control system
PDF Full Text Request
Related items