Font Size: a A A

Washington Xintiandi AB Group Of Shenyang Construction Project Quality Management Research

Posted on:2020-01-14Degree:MasterType:Thesis
Country:ChinaCandidate:Z L ZhangFull Text:PDF
GTID:2392330599454054Subject:Engineering
Abstract/Summary:PDF Full Text Request
In this paper,the construction quality management of AB group project in Shenyang new world is taken as the specific object of study.The project management knowledge system is taken as an important reference and scientific guidance.Combined with the project management mechanism,operation mode and strategy plan,taking the perspective of project leader as the breakthrough point,the construction quality management of AB group project in Shenyang new world is taken as the article.The core and focus of the study is to ensure the quality of the project to be completed on time on the premise of meeting the acceptance criteria,and to define the quality of the project as the main line throughout the paper.According to the needs of the project and a series of contradictions in the process of project management,it provides a scientific,reasonable and effective quality management strategy for the project construction,aiming at further improving the quality of the project.1.the research background,significance,purpose and related theoretical concepts of this paper are discussed in an all-round and multi-level way.This paper also analyzes the research status of project quality management at home and abroad,and gives a brief introduction and analysis of the basic situation of AB group project in Shenyang new world,and indicates the main research contents and research methods.2.Deep analysis of relevant theoretical concepts and definitions of nature.The first is to introduce the tasks and basic concepts of project construction quality management from different levels and perspectives;the second is to systematically analyze the contents of project construction quality management;the third is to discuss the role and main objectives of project construction quality management;and the fourth is to describe the difficulties,key points and core points of project construction quality management separately.3.summarize and analyze the project of AB group in Shenyang new world.One is to introduce the basic situation of the construction project;the other is to analyze the construction plan and construction scheme;the third is to clarify the key difficulties and Countermeasures of the project.This paper explains the specific situation of the project for the study of project construction management.4.Focus on the project construction quality management research.Firstly,the construction quality objectives are defined.The second is to clarify the quality assurance system in the construction stage of the project.Thirdly,it puts forward the quality management in the construction stage of the project,and puts forward scientific and specific rationalization schemes in detail in the aspects of quality assurance measures,quality common failures prevention and control,product protection and so on.Especially for the prevention of quality common failures,quality assurance program,these two aspects carried out in-depth and comprehensive analysis and research.Fourthly,the quality management of project completion and acceptance stage is put forward.Fifth,it expounds the key points of engineering excellence management.5.it focuses on other related construction site management to ensure the quality of the project.Firstly,the plane layout of construction site is studied.Secondly,from the site safety construction management measures were studied.Thirdly,it studies the civilized construction management and environmental protection.
Keywords/Search Tags:Project, Construction, Quality management
PDF Full Text Request
Related items