| In this paper,starting from the construction project quality management present situation at home and abroad,analysis of basic concept and basic theory of quality management,expounds the construction of the important role of construction project quality control,and combined with GY area social security bureau office building construction project engineering,quality management to promote China’s construction industry has made certain contribution to the research.This paper consists of six parts.In the first part,the introduction mainly describes the research background,significance,basic content and research framework.The second part is the related theory summary of construction project quality management and the research status at home and abroad.The content of this part can provide necessary theoretical basis and research methods for the follow-up study on the quality management of the office building project of the social security bureau of GY district,and improve the theoretical and practical value of the study itself.In the third part,this chapter mainly summarizes the construction project of the office building of the social security bureau of GY district on the basis of the theoretical review and research in the first two chapters,which provides a factual basis for the in-depth study of the project’s quality management.In the fourth part,through the in-depth analysis of the current situation of the construction project quality management of the office building of the social security bureau of GY district,the problems and causes of the project quality management were analyzed.It is believed that the problems of the project quality management mainly include the neglect of quality management in the survey and design stage.Procurement process quality management is not perfect;The technical level of construction personnel needs to be improved;Construction method is unscientific wait for 4 respects.It is believed that the main reason for the problems in quality management lies in the responsibility awareness of quality managers to be strengthened.No sound quality management system has been established.There is no perfect quality assessment system;The quality supervision function of the supervisor has not been effective in four aspects.The conclusion of this chapter can provide effective basis for the follow-up study on the improvement path of quality management of the office building project of the gge district social security bureau.The fifth part,based on the problems and causes of the quality management of the office building construction project of the gge social security bureau,puts forward the idea of improving the quality management of the office building project of the district social security bureau,and further points out the measures for improving the quality management of the office buildingproject of the district social security bureau.Establish a sound quality management system;Establish a perfect quality assessment and incentive system;Give full play to the quality supervision role of the supervising party.Part six is the conclusion.The quality management of construction projects is not static.With the development of society and the improvement of science and technology and management level,the content and methods of management will be constantly enriched and developed.Its goal will not only mean compliance with the standard and contract requirements,but also beyond the requirements and expectations of customers.When applying the total quality management method,it is necessary to apply the latest theoretical results of quality management flexibly according to the specific and practical situation of the project.At the same time,we should further explore,summarize and improve in the continuous practice of total quality management,and make efforts to form comprehensive quality management with Chinese characteristics. |