Font Size: a A A

Research On Quality Management Of Xi Jing Hot Spring Villa Three East Project

Posted on:2014-03-24Degree:MasterType:Thesis
Country:ChinaCandidate:S SunFull Text:PDF
GTID:2252330401484060Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, with the economic and social development of our country, the development speed of construction industry rapidly, its position in the national economy and the impact of more and more obvious. The "project, quality first!" The safety of people’s quality is the life and property of building engineering. However, some general industrial and civil construction, especially residential engineering, quality problems. Therefore, research on how to strengthen the quality management of construction project has very important realistic significance.Adopting the research method of combination of theoretical research and empirical research, to Xi Jing hot spring villa thee east project as an example, mainly from the six parts of the construction project quality management were studied. The first part is the introduction, describes the research background of this study, summarizes the domestic and foreign research status of project quality management, puts forward the research train of thought, research methods and technical route. The second part is the project quality management theory, mainly introduces the quality and quality management concept, meaning, principle and content of the project quality management, characteristics, construction project quality management of new ideas, processes and participants, the basic point of view and overall quality management. The third part is the present situation and problems of Xi Jing hot spring villa three east project, in hee King Spa Villa three east project as an example, introduced the project operation situation and existing problems, and points out the root of the problem. The fourth part is the framework of quality management city King Spa Villa three east project, according to the current situation and problems of Xi Jing hot spring villa three east project, the project quality management structure, proposed the project quality management principles and objectives, quality planning, quality assurance and quality control of the project. The fifth part is the city of King Spa Villa three east project quality management with the framework of security, the establishment of humane quality management mechanism, the credit mechanism, excellent performance and mechanism of knowledge management and information management mechanism, so that the application framework of quality management city King Spa Villa three East Project guarantees. The last part is the conclusion and outlook, summarizes and Prospect of this research.With the construction of city landscape villas and Spa three east project, found in the construction process often has the preparatory work is insufficient; the overall low level of construction personnel, comprehend ability is poor, professional quality to be improved; in the process of construction supervision is not enough, only the surface, despise the essence of the phenomenon is serious, quality control work not thorough and rigorous, so it is difficult to guarantee the engineering quality and quantity to complete. Based on analysis of the status of three East Engineering Xi.Jing hot spring villa, improve project quality management, establish a sound quality management framework and the safeguard mechanism, all these make the quality management work of the project smoothly, to ensure project quality. Through the summary and induction, the author quality management work of Xi Jing hot spring villa three east project is to implement a comprehensive quality management, quality control, establish and improve the project quality management framework and the security mechanism of the conclusion. The typical characteristics of Xi Jing hot spring villa three east project with the construction project, set up quality management framework and the security mechanism in the work of quality management in the project also has the typical, therefore, the project quality management experience and has a certain guidance and reference for the similar construction project quality management.
Keywords/Search Tags:construction project, quality management, quality planning, quality assurance, quality control
PDF Full Text Request
Related items