Study On Cost Control Of B Construction Project Of A Construction Company

Posted on:2020-01-03Degree:MasterType:Thesis
Country:ChinaCandidate:T TangFull Text:PDF
GTID:2392330590979455Subject:Accounting
Abstract/Summary:PDF Full Text Request
For construction companies,the business goal is to maximize profits.When the construction project income is certain,only reduce the cost,can get the bigger profit.At present,the construction project cost is too large,the management system is not perfect,personnel awareness is insufficient,and so on,this series of problems led to the overall economic benefits are not high.Therefore,the establishment of standardized construction project cost control for the company's sustainable development has a very necessary significance.Cost control must be the whole process control,not only to control the production cost of construction projects,but also in the bidding stage,construction preparation stage,construction process stage,completion acceptance stage are controlled accordingly.Taking the B construction project of A Construction Company as an example,combined with the organization system,control flow,personnel post distribution and cost structure of B construction project,this paper analyzes the problems existing in the cost control of B construction project from the four stages of bidding,construction preparation,construction process and completion acceptance respectively,and according to the relevant theory,This paper puts forward some improvement measures for the cost control of company A B construction Project: First,the construction plan should be formulated reasonably in the bidding stage,and the cost control method should be used to carry out the costs budget,and secondly,the cost control system should be perfected in the construction preparation stage,and the "price separation" work should be carried out in time;The deviation analysis method is used to control the cost in the construction process,and the focus of cost control is clear,and then the settlement work should be carried out in time in the completion acceptance stage,and the Cost control analysis and assessment should be carried out.Finally,in order to ensure the improvement of cost control,we should cultivate people's awareness of cost control,carry out training to improve personnel's ability,and establish personnel assessment mechanism and reward and punishment mechanism.
Keywords/Search Tags:Construction company, cost control, Construction project, whole Process Control
PDF Full Text Request
Related items