Font Size: a A A

Spacecraft Docking System Based On Computer Vision

Posted on:2020-10-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y FuFull Text:PDF
GTID:2392330578962177Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Based on the long-term extensive management model of the construction market,it has not been applied to the new national development needs in the wave of construction industry transformation.On the road of exploring assembly buildings,we need a new digital-based management model.To guide the development of the entire prefabricated building market,that is,based on a means of building information,implement a digital-based assembly-based building management model,providing architectural design,construction,and production throughout the entire life cycle of a prefabricated building.Management model,this management mode needs to cultivate composite assembly building management talents and corresponding professional and technical personnel.Based on this management model,it provides scientific management tools on the road of future assembly development,and has greatly promoted the development of prefabricated buildings,promoted the life cycle management of buildings,reduced the construction period,and reduced The cost,the waste is reduced,and the communication and coordination of various professions is promoted.It is not only the superposition management of the production enterprise,the construction enterprise,the design enterprise,but also the integration,and the personnel organization is also quite different,so that the construction industry is safe.It is no longer in the hands of traditional construction workers with different technical levels,but is more secure.In response to the country's policy of vigorously developing prefabricated buildings,it provides a theoretical reference for the scientific and effective management of fabricated buildings.Suggestions were madeon the existing problems of assembly management,and constructive theoretical opinions were put forward for the future development of fabricated buildings in an innovative management way.Digital-based management is more scientific,with traditional management methods,systematic data and information support,greatly reducing the waste of the construction industry,effective and rational allocation of resources,standing in the general direction of the entire project cycle,coordinated design Maximize the benefits of production,construction and operation,accelerate the transformation and upgrading of the construction industry,provide a scientific management method for the leading assembly-type general contracting enterprises,and also have great innovations in personnel organization,which can reduce the labor cost and generate assembly.The architectural library provides design references for future fabricated buildings,allowing the design of the prefabricated building to take into account construction and assembly from the outset,reducing design rework and waste.
Keywords/Search Tags:fabricated building, digital, management mode
PDF Full Text Request
Related items