Bian Bei Area Of The Second Phase Of The Project Construction Quality Control

Posted on:2020-03-07Degree:MasterType:Thesis
Country:ChinaCandidate:D D WuFull Text:PDF
GTID:2392330575467530Subject:Project management
Abstract/Summary:PDF Full Text Request
Due to the rapid development of Chinese economy,the urbanization level continuously improve,especially the past 30 years,our country construction step by step,is the unprecedented development,the construction industry has become the pillar industry of the national economy,the government introduced a series of policies to support the construction industry,construction industry development at the same time,there is also a huge challenge,the construction unit in the process of development is faced with enormous pressure of competition.Project quality has become the foundation of the construction unit in the construction market,but also determines the success of the project construction can be the key.Practice has proved that construction quality control must be strengthened in order to effectively improve project quality.This article through the literature investigation and analysis of project construction quality control problems,based on mutuality north village phase ii project is analyzed as a case,first introduced the research background and research significance,then through careful study and research the construction quality of domestic and foreign advanced management theory and method,on the basis of the theory,then according to the quality problems of mutuality north village issue,compare the mutuality north village second phase of the actual situation,to build the project engineering construction management method,on the basis of predecessors to engineering construction quality control of the means and measures of practical experience,combined with the difficulties in the construction of the project,and the target of the construction quality of the project,Using PDCA cycle method to control the construction quality of each branch of the project,and ensure the quality and quantity of the second phase project of bian bei community pass the final acceptance.After the completion of the project through the AHP fuzzy comprehensive evaluation method to accurately and objectively assess the construction quality of the project,and then determine that the project is not only qualified,but also excellent construction quality.Through the study of the construction quality of the second phase of the bianbei community project of the district,this paper aims to provide some reference for the construction quality problems of the construction project and improve the construction quality management level of the future construction projects.
Keywords/Search Tags:engineering project, Construction quality, PDCA cycle, AHP-fuzzy comprehensive evaluation method
PDF Full Text Request
Related items