The Progress Management Application Research Of X Data Center Software Engineering Project

Posted on:2020-05-05Degree:MasterType:Thesis
Country:ChinaCandidate:J YangFull Text:PDF
GTID:2392330572488325Subject:Project management
Abstract/Summary:PDF Full Text Request
In 2014,the Ministry of Transport organized a conference on national transportation technology innovation and informationization.The overall idea of the conference was to improve and upgrade comprehensive transportation services,focusing on "one main line and two foundations".Pay close attention to the main line of "informatization-driven transportation modernization",consolidate the two foundations of "big data" and "network security",and strive to achieve "open data sharing,network security controllable",promote the deep integration of informationization and industry,and promote Information exchange and effective connection between different modes of transportation,improve industry governance and service capabilities,and promote the development of modern integrated transportation system.As the big background,The project management of the relevant knowledge combined with the traffic system related to the X large-scale software engineering projects in the process,sum up experience and get improved,is the starting point of this article.This thesis begins with the large-scale traffic information software project of A Company,introduces the situation from the initial stage of the large-scale software engineering,and the detailed process of the project plan,and summarizes the efficiency of the second phase development after the end of the project.As a starting point,the author draws the focus of this paper,that is,how to manage the main line along the software project progress,combined with the professional theory of practical knowledge,in the modern management theory of the relevant knowledge of the software project progress Management of the principles and procedures to conduct a set of a whole and a logical statement.In this paper,X data center project,for example,trying to find in the face of a specific problem in the case should take what kind of progress control means of the answer to this question,and create a set of progress control system for the development of related software activities reference Use,change the current stage of the software project is difficult to track,control the lack of regulations,the implementation of inefficient problems.In the software development process,the emphasis on the coordination of hardware facilities and software facilities and system acceptance,to customers for each new development of a subsystem can understand and master the effect.This thesis through the actual analysis,the theory of project management knowledge applied to specific projects,to achieve a combination of theory and practice.From the project planning to the late experience of reflection,the method used on the basis of the original has been flexible.Chart analysis is relatively accurate image,especially the Gantt chart can be better than the actual progress and planning process,but in the actual project will be found from drawing to use there are still many problems.According to the situation reasonable arrangements for manpower,resources and time,and finally the successful completion of the entire project,and achieved many results.
Keywords/Search Tags:schedule management, data center, case study
PDF Full Text Request
Related items