Research On Schedule Management Of A Shopping Center Public Area Decoration Project

Posted on:2015-08-06Degree:MasterType:Thesis
Country:ChinaCandidate:C Y HanFull Text:PDF
GTID:2322330485996152Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with social progress and raise the level of architectural decoration, more and more attention to the interior of the building decoration, the decoration project schedule requirements are increasingly strict, although the decoration company for the large engineering effort at most, but many large construction engineering project is still lack of effective schedule control measures. China decoration technology and management level is still in a very backward situation, a lot of management means to show extensive state, therefore, improve the decoration company for the large engineering control ability as soon as possible, develop can not only ensure the quality, but also can keep the progress of construction mode, is of great significance to healthy development of China's decoration industry. This paper aims to provide theoretical and practical basis for the schedule management of decoration project implementation of public area A shopping center, promote the orderly, healthy development of decoration engineering project schedule management in China.This paper first to the project management, especially analyzes the status quo of domestic and international research project management, decoration engineering project management, based on the progress of the project management theory to review. Secondly, analyses the current situation of progress management of decoration project public area A shopping center and the existing problems. Again, analysis pattern decoration engineering project schedule management public area A shopping center, the general process and method of the introduction of schedule management, discussed the progress plan and process steps and method of decoration project of the A public regional shopping center. Finally, based on the progress of the project management change environment, design each stage decoration engineering project schedule management process of public area A shopping center in the progress control, using the engineering estimation, the progress of the research proposed restricting factors analysis, can be in saving the project cost at the same time, the pace of maximization, to improve project quality, achieve the decoration project public areas of the final A shopping center on schedule to complete the quality and quantity results. Making the project schedule management more standardized, scientific, reasonable, fast.Finally, the whole process of schedule management of decoration project summary and review of public area A shopping center, the implementation of a comprehensive analysis and summary, hope that the results of this study have a certain reference role for decoration engineering project schedule management of tired...
Keywords/Search Tags:Decorative items, Schedule management, Schedule delays, Network diagram
PDF Full Text Request
Related items