Research On Improvement Of Construction Design Project Schedule Management By Chengyu Group

Posted on:2017-07-20Degree:MasterType:Thesis
Country:ChinaCandidate:A T LinFull Text:PDF
GTID:2382330596962142Subject:Project management
Abstract/Summary:PDF Full Text Request
Chengyu Group is the main business of real estate development and construction.This paper analysis of the current schedule management mode design project is reasonable,monitor the construction project in the design schedule management quality cost,etc..The use of effective project management mode and means to monitor and control the whole process of schedule planning and implementation,so that the construction design of the entire production process design,preliminary design,construction drawing design from the program and the subsequent design changes better with engineering production,to improve the planning and design task design results are about the design and production line the enterprise to carry out the whole design schedule management scientific and standardized.This paper uses literature analysis method,comparative research method and practical examples,the analysis and research of Chengyu Group architectural design project management,mainly divided into the following parts: the first part is the introduction,focuses on the research background,purpose and significance of this paper.The second part is mainly about the theoretical basis of project management,project schedule management and so on.The third part is the current situation and existing problems of the urban construction design project schedule management.The fourth part is to improve schedule management method of architectural design project Chengyu Group WBS,including work breakdown,project activities and sorting time,as well as the critical path and time calculation,according to the actual situation to develop targeted countermeasures.The fifth part is the comparison of the effect before and after the optimization of the urban construction design project.The main conclusions are as follows: Research on schedule plan based on WBS,based on the decomposition of design work,task analysis,the establishment of the WBS structure,the task decomposition will continue,work contents of each layer of the task to functional departments to implement the above,real-time grasp the link resources and production situation;by professional design management staff schedule control committee,timely progress control on the design project of each region,and supervision diagram and project design on business site to match the progress,supervision design project schedule control,design task to discover the dislocation in the management process,through the network selection production node optimization,calculation the key line,reduce design node delays caused by production delays.
Keywords/Search Tags:architectural design, schedule management, improvement, research
PDF Full Text Request
Related items