Font Size: a A A

Study On Cost Control During The Construction Stage Of LY Converter Station Project

Posted on:2019-11-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y N XuFull Text:PDF
GTID:2382330572954470Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,with the continuous development of the national power grid construction,ultra high voltage direct current(UHVDC)power transmission and transformation project has broad prospects in China with its long working distance,high transmission capacity,strong stability and flexible control,etc.Among them,the converter station as an important part of DC power transmission and transformation project,it can complete the conversion between DC and AC,and meet the requirement of power system for safety,stability and power quality.However,due to the long construction period of the converter station project,the price of production factors changes frequently,which makes the cost control of the engineering construction project complicated and changeable,and with the national electric power system reform gradually,the competition of electric power construction enterprises faced is becoming more and more fiercely.Project cost control is in a very important position in the whole project target system,and the implementation of cost control play an extremely important role in reducing engineering cost,improving operation management,and improving the staffs sense of ownership and labor enthusiasm.To organize and implement cost control scientifically,we can promote enterprises to change business mechanism and improve the quality of enterprises comprehensively,so that enterprises can survive,develop and prosperity in the environment of market competition.Therefore,how to control the construction costs of the construction stage effectively becomes one of the major problems that electric power construction enterprises need to solve right now.For cost control research starts late in our country,and the history is not long.This article obtains from the concept of cost control,based on the existing problems and deficiencies of the status quo analysis of China's electric power engineering construction project cost control,taking the cost control of the LY converter station engineering construction project as an example,based on the good theory of cost control and the present situation at home and abroad,combined with the actual situation,according to the specific problem specific analyses.Matter-of-factly,according to the present situation of LY converter station engineering construction projects,based on the perspective of sustainable development,as well as the factors that influence the project cost control,there are two aspects of research on the pros and cons of the project specifically,and the measures and suggestions for the project cost control are put forward from various angles and directions by stages,in order to effectively control the construction cost of the construction project.
Keywords/Search Tags:converter station, construction stage, cost control
PDF Full Text Request
Related items