Research On Schedule Control Of The Yitong River Middle Section Project In Changchun City

Posted on:2019-06-17Degree:MasterType:Thesis
Country:ChinaCandidate:W W ZhouFull Text:PDF
GTID:2382330548957124Subject:Engineering
Abstract/Summary:PDF Full Text Request
Under the background of ecological civilization,urban river management is an important part of local government to promote environmental protection.How to effectively promote urban river management is an important subject in urban infrastructure construction.The key of project management is to minimize the investment and save the cost on the premise of guaranteeing the progress and quality of the project by optimizing the project schedule control scheme.How to apply modern project management theories and methods to urban river governance projects and further improve the level of river governance project management is very necessary.Based on literature and practice research,this paper systematically combs the relevant theories and cases of project management and schedule control,analyzes the factors,problems and reasons affecting the progress control of urban river management in Changchun city,and makes an empirical study of the project of middle section of yitong river management in Changchun city.The main content consists of four parts: Firstly,the research of this topic involves the project management and progress control related theories and methods.Secondly,on the basis of the objective introduction of the middle section of Yitong River project in Changchun City,it is pointed out that the middle section of Yitong River project has strong systematicness,involving multi-professional cross,multi-level coordination,and has certain characteristics of synergy and complexity.This paper analyzes the present situation of the control of the progress of the middle part of the Yitong River project.Man-made factors include the complexity of decision-making procedures,the speed and slowness of decision-making efficiency,the proficiency of construction enterprises and the investment of human resources,and the game between enterprises and government interests.Third,the project progress control method is used to optimize the project progress control in the middle section of yitong river in Changchun city,and the optimization ideas and countermeasures are put forward in four aspects: establishing a target system with time progress subordinate to quality,introducing third party technical advice,building a quality control system that breaks the horizontal division and professional division,and establishing a responsibility control system that is consistent and level by level.With this as the guidance,combined with the actual project,from the aspects of space coordination,time connection optimization and other optimization.possibilities.Based on the WBS method,analyzes the milestone node plan of the middle river management project.According to the idea of space compatibility and time synchronization,the project schedule optimization is carried out in the middle section of the Yitong River.Finally,from the implementation mechanism,organizational process,human resources three aspects to ensure the middle part of the Ito River governance project progress control measures proposed.Through the research of this topic,it can promote the development of the urban river management project to a more scientific and refined management direction,and ensure the quality and quantity of the middle section of the yitong river management project to achieve the management goal,which is of guidance and reference to other urban river management projects.
Keywords/Search Tags:River Governance, Project Plan, Schedule Control
PDF Full Text Request
Related items