Research On The Construction Progress Control Of Project Under JXNUF School

Posted on:2021-03-28Degree:MasterType:Thesis
Country:ChinaCandidate:T MaFull Text:PDF
GTID:2392330602978224Subject:Project management
Abstract/Summary:PDF Full Text Request
As a supporting infrastructure of urban community,school is a focus of people's attention.However,in recent years,because the progress of school construction project is not strictly controlled,the school cannot be delivered and used on time,which leads to the delay of students' enrollment and the frequent incidents of residents' conflict.Therefore,this paper studies the progress control of school construction projects,finds out the reasons for the lag of school construction projects,and puts forward solutions.It is of great significance to build a harmonious society,ease the contradictions among residents,ensure that students can receive education on time,and improve the popularization of education.The paper is mainly divided into six parts,the first part describes the basic research background,research purpose and significance,literature review;the second part describes the basic theory overview,including the theory of project schedule management;the third part mainly describes the characteristics of jxnuf school construction project;the fourth part mainly analyzes the basic situation of jxnuf school construction project schedule control;the paper The fifth part puts forward the corresponding improvement measures for the progress control of jxnuf school construction project;the last part is the summary of the full text.I hope that through the research of this paper,the expected goal is to study the concept,characteristics,methods and steps of progress management research of jxnuf school construction project through theoretical research and literature research.Finally,taking the construction project of jxnuf school as a case study,the effective progress control measures are put forward.Through the research of this paper,it is clear that the main factors that affect the progress of school construction projects are investment,developers,design and construction units.Starting from these four influencing factors,this paper compiles the project schedule of jxnuf school,calculates the current progress of jxnuf school by using the method of project earned value,and finally puts forward management measures from four aspects of organization plan,project resource guarantee,engineering personnel arrangement and project schedule emergency management to ensure that jxnuf school can Interim delivery.
Keywords/Search Tags:project schedule plan, project schedule control, schedule plan preparation
PDF Full Text Request
Related items