Research On Panning And Control Management Of New Project Engineering In DATANG DONGYING Power Station

Posted on:2019-08-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y L ZhangFull Text:PDF
GTID:2382330548457125Subject:Engineering
Abstract/Summary:PDF Full Text Request
Electric construction project is a large-scaled,complex project with many participants in limited deadline.During the whole constructive process,from power plant design,power equipment production,site installation to project operation and maintenance,there are many uncertainties to face in each phrase.As the source of all work,the design of the power plant plays a vital role during the whole project operation.It is not only about whether the whole project can be operated smoothly,but also its benefits to the project also has a great impact.Meanwhile,for design work,not only the quality of design work,it is necessary to ensure that the progress of the design should be coordinated with the bidding of the owner,the construction of the construction unit and the equipment production of the supplier.This paper takes Datang Dongying new million-unit project as an example.It covers the general introduction of the relative information on Dongying million-unit project and the main task responsibilities,which is mainly focused on Datang Dongying new million-unit power station project design to elaborate the project management that is used during the design.It expounds and analyzes the current problems in the progress control of Datang Dongying new million-unit project,and finds out the factors that affect the design progress.Later by using the theory of modern project progress management,the working structure of Datang Dongying new million-unit project is decomposed.And on this basis,the scheduled plan of the project is established by using EXCEL.At the meantime,the control measures,which are to ensure the project is operated according to the plan,are explained in details.It not only summarizes the application of project management in the construction of Dongying new million-unit project,but also predicts the application of the project management model in energy power industry.As well as using modern project management in the scientific way,it also makes an explanation on the deficiency and the insufficiency of current power station design management.Starting from the fundamental elements that affects the design,it ensures all project participants,especially management get all information from the project in real time according to the grading management and personnel management scheme of the project.In the process of project implementation,it uses scientific and reasonable control method to establish a comprehensive project management platform,which improves project management level effectively in order to promote this project smoothly,and can be used as a reference for other similar projects.Along with the change of the domestic and foreign power industry,the domestic electric power design companies are facing the severe market survival problem at present.Only does the company keep reforming,the technology is continuously optimized,and management is continuously strengthened,it could have a foothold in the power market.Hence,we should accumulate the experience in practice,summarize the methods,strengthen the management of design continuously,complete the design management theory gradually,and make it scientific and reasonable applied to each project in order to make the power station design management to complete and develop continuously,and provide help for future work.
Keywords/Search Tags:Power plant design, scheduled plan, process control, process of the security
PDF Full Text Request
Related items