Font Size: a A A

Study On The Problems And Countermeasures Of The Implementation Of The Project Of Environmental Sanitation Vehicle Automation In Longyan

Posted on:2019-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:J C WangFull Text:PDF
GTID:2381330590963191Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China’s urban construction,the requirements for urban cleaning work are gradually improved.Longyan city urgently needs to improve the working conditions of sanitation work through implementation of the environmental sanitation automation project to meet the practical needs of workers’ safety and health.But due to limited financial capital and industrial infrastructure projects,such as the influence of various factors,the current longyan city sanitation vehicle automation project implementation also faces installation debugging environment is not ideal,garbage disposal,low capital investment scale,industrialization development lagging behind,imperfect system and transport problems in aspects of safety training does not reach the designated position,need to be on the basis of investigation and analysis,put forward corresponding countermeasures.In this paper,using literature analysis,interviews,information research,comparative analysis and other methods,combining with the dynamic development of sanitation vehicles at home and abroad,in longyan city sanitation vehicle automation project implementation problems and its reasons are studied,on this basis,from improving sanitation installation debugging environment,optimize the environment of sanitation automation projects,improve project implementation and to make effective monitoring the project put forward corresponding countermeasures,to clarify in longyan sanitation vehicles automation project implementation and the development goal and direction,to promote the implementation of the project,improve the management level,etc.,city sanitation work has important practical significance.
Keywords/Search Tags:sanitation vehicle automation, project implementation, problem, countermeasure
PDF Full Text Request
Related items