Font Size: a A A

A Study On Beishitiao Sewage Treatment Works Project

Posted on:2019-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:H S ZuoFull Text:PDF
GTID:2371330548958819Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,the rapid development of China's economy and the improvement of urbanization level,the effluent of industrial effluent and the sewage of residents' domestic sewage have become increasingly serious to the urban ecological environment.The water quality in the city has been declining.Changchun city as the capital city of jilin province is the political,economic and cultural activity center of jilin province how to reduce the sewage to the destruction of the urban water ecological resources to realize the harmonious development of economy is the government priority.The construction of sewage treatment plant can reduce pollutant discharge,improve urban water environment,reduce pollution degree of urban river channel,and improve the quality of people's living environment.It is conducive to improving the investment environment of the city,promoting the investment promotion of the city and promoting the development of changchun,which is conducive to the sustained and stable economic growth.It can be said that the construction of sewage treatment plant is an important way to solve urban sewage treatment.According to the water quality requirements of yitong river,the effluent of sewage treatment plant needs to meet the a-level standard.In the process of sewage treatment,the application of the process directly affects whether the effluent quality meets the standard requirements,and also affects the processing cost and the difficulty of daily production management.Therefore,the sewage treatment must be carefully selected according to the actual situation of changchun,so as to achieve the best effect and ensure the water quality.In this paper,with the current advanced scientific theoretical analysis,combined with domestic and foreign advanced wastewater treatment process combined with changchun north at present the basic situation of article 10 the establishment of a scientific and reasonable planning.At the same time,the feasibility analysis of the social factors,technical factors and safety factors that may affect the project is also carried out.At the same time,the project management and project risk management are used to make scientific and reasonable prevention of the pollution problems and safety problems that may arise during the construction of the project.
Keywords/Search Tags:Sewage treatment, Project construction, The project management
PDF Full Text Request
Related items