Font Size: a A A

Research On The Quality Management System Of The Wastewater Treatment Plant Construction Project Of A Town In Panjin

Posted on:2019-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:X JiangFull Text:PDF
GTID:2371330542986377Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,with the rapid development of China's economy,the shortage of water resources is becoming more and more serious.Strengthening the reuse of sewage has become the key.After treatment,the effluent discharged into the standard has become a valuable resource.Therefore,the quality management of the construction project of the sewage treatment plant is the key to the success of the sewage treatment.Through the quality management methods of sewage treatment plant construction project based on project case,can be scientific,reasonable and effective management of the whole process of project construction,to ensure the sustainability of the engineering construction,shorten the construction period of the project,reduce the cost of investment,so as to provide a reference for other sewage treatment plant construction project construction and management,to provide protection to achieve the goal of construction of the project,the project after the completion of sewage treatment facilities to the full operation,the full realization of social and environmental benefits.Based on this,this paper takes the construction project of A town sewage treatment plant in Panjin as the research object,and carries out on-the-spot investigation on the related aspects of the project through investigation,and obtains relevant data and data that meets the research requirements.At the same time,this paper constructs the A town of Panjin city sewage treatment plant construction project quality management system,which is combined with the whole process of project construction,sewage treatment,according to the factors affecting the quality of the project,formulate the corresponding quality control measures,including the construction of quality management personnel,mechanical equipment,material supply,technical methods and environmental factors in five aspects and the corresponding safeguard measures.The main conclusions of this study include the following three aspects: first,the related theory and research status at home and abroad based on the project quality management,combined with the actual quality management of factory construction project A town sewage treatment in Panjin City,found that the quality management level of the main factors include human resource factors,equipment factors,material factors,design and processing selection of process factors,construction of environmental factors in five aspects;second,the establishment of quality management system is one of the most effective ways to improve the quality management of sewage treatment projects,plays an important role in reducing production costs,improve water quality,improve customer satisfaction;third,the quality management of the implementation of sewage treatment plant construction project,the quality of implementation and quality to guarantee the implementation of all aspects of sewage treatment project,the project unified command,grading management,real Human resources,financial resources,material resources and information resources play an important role in improving the quality management of construction projects.
Keywords/Search Tags:Wastewater Treatment Plant, Construction Project, Quality Management System, Quality Control
PDF Full Text Request
Related items