| With the deepening of reform and opening up process, our country’s economy, culture and other aspects have developed rapidly and our country’s industrialization level has been greatly improved. The rapid development of various industry that brings industrial wastewater pollution problems are more serious. In recent years, the industrial wastewater discharge situation got a degree of governance, but the difficult task of industrial wastewater treatment in our country, still need to constantly strengthen the governance of industrial waste water in the future. An important factor of success for treating industrial waste water is the quality of the industrial wastewater treatment project, the high quality of wastewater treatment engineering is the key to get good treatment, A survey results show that China’s current industrial wastewater treatment projects failure rate is very high and a lot of managers have not realized the importmant of the quality of the industrial waste water treatment engineering. In this consideration, the quality of the industrial waste water treatment project management is particularly important.Project quality management is a system engineering, including project quality plan, project quality guarantee and project quality control, industrial waste water treatment engineering is an important project that effect the quality of people’s living environment, so it is important to carry on the comprehensive quality management. This article will expound the quality management, and the quality management will be used in industrial wastewater treatment engineering project.This paper introduces the relevant theories of project quality management, including the basic concept and principle of project quality management, the basic principle and the main theories and methods of project quality management; Then the research object of this article-hengda company introduces the basic situation of wastewater treatment project, and introduces the hengda company wastewater renovation project quality management principles, objectives, procedures and steps. for a more scientific and reasonable to quality management. On the basis of using the combination of qualitative and quantitative analysis of hengda company wastewater renovation project on the basis of project quality management theory, using PDCA cycle method wastewater treatment project of hengda company established scientific and reasonable quality plan, including the establishment of the quality system, formulation of quality policies and objectives as well as the construction of a quality management organization; Quality assurance including formulating the basis of the project quality guarantee and project quality assurance system; Quality control including the establishment of project quality control system and project PDCA quality control loop, the final quality goals by establishing performance management mechanism and strengthening the construction of informationization of quality management on the quality improvement, to ensure the quality of wastewater renovation project of hengda company.On the basis of research, we estabished a seriese of policies for hengda company’s wastewater treatment including quality policy, quality objectives and quality planning system, in the mean time, established the architectural design, material selection and so on six aspects of quality assurance system and PDCA cycle method is used for quality control. Finally, this paper from the perspectives of human factors, mechanical equipment, setting up quality control system, guarantee the quality of the hengda company wastewater treatment renovation project. |