Font Size: a A A

The Research And Practice Of Labor Force For State Grid Corporation

Posted on:2018-08-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y L LvFull Text:PDF
GTID:2359330518955605Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the development and progress of the era of information technology,information system came into being in the business work,national Power Grid Corp is also constantly adapt to the development trend of the times,the information construction for the important business of labor force and national Power Grid Corp human resource management,also joined the ranks of the informatization construction,labor force involved a large amount of data,the factors are complicated.A complex algorithm,the artificial statistics calculated with traditional labor quota way already can't adapt to the speed of business development.The national Power Grid Corp personnelwork involves many professional staff estimates,hierarchical and professional data collection equipment,labor ledger data,combined with the latest standard model of labor quota,quota of calculation,a nd combined with the calculation results and employment data,the results should be used for the actual number of decomposition,business.Through the construction of information system,all processes,through the information system of the way to improve t he accuracy of the data,improve work efficiency,in the face of changing capacity calculation algorithm,the complex data,is not the problem.On the basis of the overall national Power Grid Corp information construction requirements,combined with advanced technology and tool in the field of information technology,the construction of this system based on Sotower platform,and uses B/S architecture,using JAVA language,and the system performance,stability and other aspects of the consideration based on using large relational database Oracle11 G as the backstage database system construction this time,to carry out system construction work.The construction process of the system,in-depth business needs full investigation of labor quota,rigorous analysis and quota system for business needs,and realize the system construction.The construction of this system mainly includes organization management,role management,login authentication,measurement unit management module,data management module,employee ledger data collection and calculation quota management module,quota decomposition module,statistical analysis module.The management system is used in the calculation of labor force within the national grid,to adapt to the overall requirements of the formulation of national Power Grid Corp labor quota standard,based on the configuration file,to achieve high accuracy of data collection,accounting calculation work quota requirements,through the statistics analysis function provides data support for the decision-making of the enterprise.
Keywords/Search Tags:national grid, labor force, ledger collection, quota calculation, Sotower, B/S, Oracle11G
PDF Full Text Request
Related items