Font Size: a A A

Research On Bid Risk Management Of DJ Group Based On EPC Model

Posted on:2018-10-19Degree:MasterType:Thesis
Country:ChinaCandidate:G M XuFull Text:PDF
GTID:2359330515964868Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years,with the continuous improvement of economic and social development level,the construction industry has developed rapidly.The number and size of the project also increase,the difficulty of project management has gradually increased,the traditional project management model has been unable to meet the needs of modern construction projects,the urgent need to adopt more advanced project management model to improve the quality of project management The EPC project general contracting model to follow the scientific and standardized management concept,while improving the quality of the project at the same time,more effective in reducing costs,but the risks are also increased.Therefore,in EPC management mode,the evaluation and management of project bidding risk has certain research and practical value.This paper studies the bidding risk evaluation and management of EPC project of construction enterprise,and the main research contents are as follows.Firstly,the concept of project management,project bidding risk and project bidding risk management are expounded,and the factors influencing the project bidding risk are analyzed,and the risk management process is evaluated.Secondly,taking DJ group construction enterprises as an example,this paper analyzes the current situation of bidding risk management,finds out the types of bidding risks faced by enterprises and the problems existing in bidding risk management,and develops effective bidding risk management methods.On this basis,this paper establishes the project bidding risk evaluation model,lists the bidding risk evaluation index system,through the "construction enterprises bidding risk list" survey results to determine the index weight,and the use of ANP method to assess the risk,Draws the result of risk assessment,combined with the actual situation of construction enterprises,put forward the project risk control strategy,Finally,taking the Mingji Agile project of DJ Group as an example,this paper uses the bidding risk evaluation model established in this paper to identify and evaluate the bidding risk of the project,and explain the measures to deal with the risk,and find out the existence of bidding management,And put forward the proposal of bidding risk management to provide reference for the management of actual bidding work in the future.
Keywords/Search Tags:EPC model, bidding risk identification, bidding risk evaluation, bidding risk management
PDF Full Text Request
Related items