Project management is one of the most effective tools in modern enterprise and academia.In project management,time management plays a vital role in project management.Real-time management of the implementation of the project to all aspects of the project is time management.In the project management in the various time periods,the development of appropriate schedule,and then in the implementation of the plan,the need to manage according to the actual situation,if there is a deviation,need to find the reasons for the deviation,and then necessary to remedy,change the original planning.The objective of this paper is to ensure that the project achieves the expected results within the specified time and achieve the overall project construction objectives.In this paper,Sichuan tobacco network optimization project as a typical case,first of all from the project progress management theory,introduced the progress of project management and project management definition.On the basis of relevant theoretical knowledge,the meaning of project management in this project is explained,which involves the work package decomposition,work package sorting,and time budget and project process.And the use of project software,the key path method,and grid method and cross-channel method in-depth analysis of the project schedule planning,progress control and progress improvement,so as to ensure that the entire project can be completed within the specified time.In this paper,through the time management of SC Tobacco Company wide area network optimization project,the project work package is decomposed,sorted and time estimated.On this basis,the use of project software to develop a project schedule.Through the identification of the potential problems of the project,the key path method,the grid method and the cross graph method are used to analyze the progress and control of the project.Finally,on the basis of the progress control analysis,the measures to improve the project time management are put forward.Finally,through the theoretical and practical case analysis,to explore the wide area network optimization project construction to provide theoretical and practical guidance. |