Font Size: a A A

Research On The Incentive Mechanism Of PPP Project General Contracting Contract With Cost Plus Remuneration As The Pricing Method

Posted on:2018-03-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhouFull Text:PDF
GTID:2352330518464655Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
Nowadays,public-private partnerships(PPP)have been widely used in considerable public basic facilities in our country.For one thing,it can relieve the financial pressure of local governments.For another,it increases the efficiency of the private capital.Whereas,how to prevent risks and boost private sectors’ confidence in PPP project are the first priorities in PPP operation progress.In the PPP project construction,contract management is a top priority,and naturally cost problem for investors becomes the core problem.This article starts in the general contract of PPP project construction,based on the research of the valuation way to prevent the occurrence of the PPP project risk.So that they can take the initiative to reduce risk and let the private sector of the PPP projects have more confidence.This paper can be divided into several parts:First of all,I will summarize the ppp project and the current domestic situation of Cost-Plus-Fee Contracts.Mainly through the analysis of related research at home and abroad and the exsiting theoretical basis,it will provide ideas and basis for the next step in-depth study.Secondly,I will analyze the related theories of the ppp general contract which take CPF(Cost-Plus-Fee)as pricing method.By comparing the various pricing methods,it is concluded that taking CPF as pricing method in the PPP general contract will domenstrate their own advantages and actualise the win-win situation.Thirdly,through the analysis of CPF pricing method and the current situation of the ppp project,the main problems and risks are found out,then put forward the problems to be sovled and bulid a model for the proposed issues.Eventually the issue will be worked out.Finally,combining with the practical building case,this paper validates the model and excludes some points that need to be paid attention in applying.I go to great lengths to make the model to be more practical and dedicate to the sound development of the PPP project.
Keywords/Search Tags:PPP project, cost plus remuneration, contract management, earned value method
PDF Full Text Request
Related items