Font Size: a A A

Research On The Construction Of A New Plant In Sewage Treatment Equipment Manufacturing

Posted on:2018-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:Z C GaoFull Text:PDF
GTID:2351330533462209Subject:Engineering
Abstract/Summary:PDF Full Text Request
In the 21 st century,the rapid development of economy has greatly improved the living conditions of people,improve people's living standards,but also brings the huge waste of resource and ecological environment destruction,sharply at present,90% of urban water pollution in our country,70% of urban river is not suitable for drinking water,80% of the untreated sewage direct emissions,combined with our country's water resources itself has less volume,large population,per capita is little,uneven distribution of water area,water and soil resources matching the characteristics of the sewage treatment become one of the important tasks of the current economic development,national demand for sewage treatment facilities has increased dramatically,the state has adopted a series of policies and measures to encourage enterprises to develop the sewage treatment technology,production of high-tech content and high efficient wastewater treatment equipment,in this situation,visa for environmental technology equipment co.,LTD.Wei Fang actively respond to a nation's call to seize the opportunity of development,combined with the company and the local actual situation,decided to the new sewage treatment equipment manufacturing new factory.In this paper,combined with the actual situation of Wei fang local,using project management related theory and method,for visa of environmental technology equipment co.,LTD.Wei Fang new sewage treatment equipment manufacturing plant projects are studied,through the actual visa rationality analysis methods such as survey and data analysis of sewage treatment equipment to build the new factory,the application of the project management during project construction,and analyzed the project construction process in the organization structure,cost control,progress control,quality control and risk management,existing problems and the insufficiency,and put forward specific improvement scheme and measures,and summarizes the experience and lessons in the process of the project,provide a reference for other sewage treatment equipment manufacturing factory district construction,avoid subsequent projects delayed,with rational allocation of manpower,material resources,to save time,make the enterprise can quickly and quality to complete the construction of the new factory,to ensure that the sewage treatment equipment can put into production as soon as possible,for the development of the sewage treatment equipment and environmental protection in China as a power.
Keywords/Search Tags:Sewage treatment plant, New plant, Project management, Improve, Application
PDF Full Text Request
Related items