| In the scheduling management on duty process,many times Weihai power grid still use manual way scheduling and shift management.The original manual mode of scheduling management more and more can not meet the daily work of Weihai power grid,manual mode has been gradually replaced by the computer.Only to change the original scheduling management on duty,can change the traditional manual mode and manual entry schedule log mode of Weihai power grid,can save the times of scheduling staff on duty manual input and shift proofreading.According to the current situation of Weihai power grid,in order to improve work efficiency,Weihai power grid special needs design and implement a management system for integrated scheduling on duty.Scheduling management on duty system based on the current industry mainstream for the complex application of enterprise-class technical framework,using B/S three-tier structure based on J2EE standard,the use of advanced O/R mapping mapping mechanism to achieve a good object-oriented development program,while in the user interface through the MVC mode control,background processing using the Spring + Ibatis framework to ensure that the scheduling duty management system with a high degree of ease of use,good scalability and strong portability.Scheduling management on duty system completes the integration of duty log management,independent duty management and automated duty management.Among them,the integrated duty log management completes the scheduling duty log management,monitoring the duty area,with the network integration of the duty area,integrated duty registration area,integrated duty comprehensive query area,transfer class minutes,shift management,scheduling management.Independent duty management completes the scheduling duty management,monitoring value management,distribution network independent duty area,independent duty registration area,independent duty comprehensive query area.Automated duty management completes the work of the engine room management,equipment inspection records management.After the operation of the system,it is convenient for the Weihai power grid to construct a more perfect maintenance mechanism for operational risk warning,it is able to be the role of personnel on duty to complete the Weihai power grid regulation and maintenance to allow the analysis of the degree of visibility and intelligence,it also saves labor costs,improves the management of Weihai power grid management management level,information and work efficiency. |