Form A Complete Set Of Base Station Renovation Project Quality Management And Research In Chengdu Mobile

Posted on:2018-07-20Degree:MasterType:Thesis
Country:ChinaCandidate:H FuFull Text:PDF
GTID:2348330512483137Subject:Engineering
Abstract/Summary:PDF Full Text Request
Now chengdu mobile network of GSM,td-scdma and three different formats of the td-scdma LTE network,formed by the base station main body size is more than 20000 points,the base station equipment old phenomenon seriously and energy-saving and intelligent degree is not high,lagging in the base station equipment update to chengdu mobile base station brings huge hidden trouble on the performance and security.Chengdu mobile has gradually carried out in 2012 stations checking of form a complete set of engineering,general base station equipment is divided into three large systems,power supply system,monitoring system and air conditioning system.In a clampdown on past are scattered form a complete set of equipment for base station renovation,so did not form system renovation process and specification,the quality of equipment after the renovation of no higher protection,cannot effectively to control construction quality.Network optimization center was established in 2015 the first phase of the project team,base station equipment regulation for vvips base station,transport nodes and colocation stand to pay(straight)flow power supply equipment system,dynamic environment monitoring system,base station air conditioning system and other classification renovation project management activities.Base station renovation projects are faced with the problem more negative miscellaneous,involves more control points,to detect the content of the regulation is various,the professional technology demand is higher,the construction process of the installation and production process of installation personnel demand is higher.In addition,the supporting base station regulation involves many professional,coordination between the various type of work is very important.These problems to the current regulation of project smoothly has brought the huge challenge,to the project schedule,quality,risks,are tested.This paper mainly studies and analysis of the base station renovation project quality management,effective control over the quality of construction.Mainly USES the project management basic theories,methods and means,combining with the characteristics of chengdu station renovation projects to have a system with the purpose of quality control,to ensure smoothly to achieve the quality objectives of the project.In project quality management,will use the basic method to build a reasonable management system of quality management,such as the project organization structure,the division of responsibility,project quality objectives,quality management plan,the quality control standard and the process of making the emergency measures.In the process of concrete construction,the development of project quality control points,and through the quality check the comprehensive supervision on the whole process of project construction,effective guidance and timely correction.Through the application of the project quality management theory,improve the quality of project of chengdu mobile base station renovation project,and provide good reference for later improvement project,using the renovation project on the quality of supervision,analysis and research of the practice and reform,to explore new period new necessary rectification process,the reasonable project quality supervision and management system and form a complete set of feasible corrective control scheme.Make up for the chengdu mobile in quality management in the blank form a complete set of regulation,also provide powerful science basis for later projects.
Keywords/Search Tags:power supply system, monitoring system, air conditioning system, VVIP transport, network node
PDF Full Text Request
Related items