| Daqing Oilfield Engineering Construction Co.,Ltd.,has chemical petroleum engineering construction general contracting qualification.Has the strong strength in the design,construction and other aspects,so that large EPC general contracting projects become the focus of the company.In 2010 March,the Ministry of Construction issued new standards for the special qualification of construction general contract enterprise,First Grade qualification of construction general contract enterprise information put forward to make clear a requirement,and as required,to improve the general construction contractor enterprise informatization to reach to the level higher than ever before..Although the company in the construction field of rich experience,but with the development of the industry,the traditional management mode has been far behind the application of information technology and continuous improvement is brought to the construction enterprise project management innovation,while the construction of informatization level from another aspect reflects the management level of enterprises,coupled with the special qualification requirements are back on the level of application of information technology,the company faced with hitherto unknown challenge,develop a set of special qualification to meet the level of information requirements and the company on the EPC project management and control platform imminent.Therefore DQECC independently developed the LinkBase project management platform and instant messaging system,according to the company on the EPC project management features,this paper through the research of EPC project management mode,to carry out the two development work for functional EPC project management in the platform.Combined with the actual situation of the company,management process,establishing reasonable system structure,the definition of the EPC project management technology architecture,architecture as defined in schedule,material,equipment,technology,quality five aspects of the more than 30 different business functions,and constructs the data model in all aspects,on the platform of a business function.After the test and preliminary application,implementation of EPC project management information system,to achieve a relatively ideal management effect,focused on solving the key to control of the whole process in EPC project management,the schedule management accurately and timely,material consumption has been effectively controlled,equipment for the effective use rate reached a high level,technology,strict quality.With the application of information technology to improve the management level of the company has been continuously upgrade. |