S234 South Extension Project Risk Analysis Of Shandong Province

Posted on:2018-08-03Degree:MasterType:Thesis
Country:ChinaCandidate:H Y ZhangFull Text:PDF
GTID:2322330542957862Subject:Project management
Abstract/Summary:PDF Full Text Request
In May 2016,the Ministry of Communications issued a document,China will be in the next three years invested nearly 5 trillion yuan($ 770 billion)to build transport infrastructure.In recent years,China's economic and social development has entered a critical period of both quality and quantity.In the era of rapid economic growth and seeking to build a modern economy,capital expenditure,especially local traffic engineering,has very positive significance to the country and the local The However,in the process of local highway construction,quality,safety and other issues emerge in an endless stream,which also reflects the local government for highway engineering risk management weakness.S234 South Extension Project,as the first independent construction of Taierzhuang District,infrastructure construction projects,is the face of economic downturn in the face of economic development and transformation of a major opportunity,the project based on the project,the project carried out the project Risk analysis.Based on the theory of risk management and the actual implementation of S234 South Project,this thesis adopts a three-step approach to evaluate the risk of S234 South Extension project.In the first stage(Chapter 1,Chapter 2),the basic theory of international and domestic risk management research and the basic theory of highway engineering risk management are described.The method of AHP,Delphi,risk probability-Impact matrix method based risk analysis method.In the second stage(Chapter 3,Chapter 4),the basic situation of S234 South Extension Project is introduced.Based on the project practice,Delphi method and brainstorm method are used to identify the project risk factors.Identify project risk 8 categories,26 items.In the third stage(Chapter 5),according to the results of the previous two phases,according to the existing mainstream research methods,the use of analytic hierarchy process,Delphi method of combining the risk indicators selected,selected risk indicators 8 categories 18 The risk assessment of the project is carried out by using the method of analytic hierarchy process and risk probability-influence matrix method to obtain the conclusion that the risk degree of S234 South Extension project is small.Based on the research of risk management related knowledge,this thisis establishes the risk index system of the project,initially identifies and evaluates the risk of the project,hoping to use this as a case to provide a risk analysis method for other similar project risk management.
Keywords/Search Tags:S234 South extension project, Risk analysis, Risk factor, AHP
PDF Full Text Request
Related items