All Channel And Reverse Process The Research On Design-construction Integration In Construction Decoration Projects

Posted on:2018-11-11Degree:MasterType:Thesis
Country:ChinaCandidate:J P YangFull Text:PDF
GTID:2322330536469055Subject:Master of Engineering
Abstract/Summary:PDF Full Text Request
China decorative project management general situation can be used in accordance with the industry's mantra to sum up: "decoration,decoration,decoration,repair."".This sentence has two meanings.First,if it is not repaired,it will not be completed,and two,if it is not repaired,it will not be completedThe science management founder Taylor said: management tells us how to establish a goal and how to reach it via best way and effort of people.According to above logic,this thesis explains how to utilize the final rendering drawing(reverse process target presentation)as the management target and the reverse process as the medium.In the end,to reach the goal of shortest timeline,most economical investment as well as best decoration result via the vertical management of interdisciplinary talent and comprehensive management theory regarding design and build.(whole channel communication,critical path method,network planning,cooperative management,vertical management and objective rresonance)First of all,To be oriented by the final decoration result,after the big data was fully utilized via advanced Internet,and after organization of interdisciplinary talent who are good at both design and construction,one management platform was invented with involvement of design process and construction procedure.In addition,to break original working procedure with new sequence,to break those out-of-dated principle that design is design and construction is construction,in the end to integrate feasibility and expected decoration result via injecting the construction procedure of critical path directly into the concept design,which could be called the Reverse Process under the mode of integration management.Through vertical management system btw designer and each individual constructor during each specific construction process,to reach the objective of economic schedule as well as secure the expected decoration result.By means of integrated management to realize the possibility of overall management,in the end,to deal with complex building,large office arena,and huge public facility without hurry as well as to reach the best decoration result with lowest consumption of manpower plus material resource.As the critical sub-branch of Management Science,the science status of Project Management has been widely accredited by offshore management scholars.The international Project Management scholars believe that Project Management is Network Plan Technology and which was developed from the Critical Path Method which was invented by Hua luogeng.The core idea of Critical Path Method is “overall planning plus stress on the key points”,which is still the core heart of key path and flexible time regarding network plan.Under the background of globe Internet Populiritization,and with widely application of big data,cloud calculation,cloud platform,the science technology has been taken to a higher level.Currently the advanced technology can deal with all issues at a wider range,coordinate a more complex process flow and manage more diversified objective.From focuses only on object to extent to manpower,finance and object,in addition from focuses only on time management to extent to time,quality,budget and profit,even with various methods and ways to coordinate and manage satisfaction of multiple relevant parties.With speed up of such process,people found that the Critical Path Method,which was invented by Hua luogeng,could become the core guiding ideology,the bigger the size as well as the complexity of a project,the more needed for the guidance of it.This thesis is mainly focus on the Integration of the design and construction management mode regarding decoration project.To be guided by the Critical Path Method from the kick-off of design to the construction then till the operation stage management.In addition,to apply such critical tech method and guarantee measure as advanced Reverse Process Study,Reengineering Method,Internet+,systematology,integrated method,Coordinated pre-control management,vertical management,overall channel communication to realize the integration management mode.
Keywords/Search Tags:Integration of design and construction, Critical Path Method, Coordinated pre-control management, Vertical management system of interdisciplinary talent, All channel and Reverse Process
PDF Full Text Request
Related items