| At present,in the traditional marketing service and distribution network management system,the marketing customer service system and distribution network production are two relatively independent professions.Information can not be a high degree of sharing,and coordination ability is not strong.With the advance of power market reform,power enterprises urgently need to improve work efficiency,innovate work flow,and create a new power enterprise management mode.In order to achieve these objectives,it is necessary to deeply integrate marketing,distribution network,power grid and SCADA in enterprise.Firstly,the paper summarize situation of distribution network management system,analyzes the limit of distribution network management system in the implementation of power marketing.A new structure is designed with the need of power distribution network development.With the independent development of marketing system and distribution network,in order to solve the problem that information cannot be shared and cooperation ability is not strong,this paper,combined with the actual situation of Hangzhou power grid,relies on the business support system of marketing,inspection,SCADA.Production equipment resources and marketing user resources to establish a corresponding relationship,to achieve cross-sectoral multi-professional data integration and business continuity.In this paper,the system architecture of Marketing and Distribution system is deeply analyzed,and the general idea,system architecture and implementation method of the system construction are studied.In addition,the solution to the problem of data inconsistency among the various systems is solved,and the new data is ensured to be consistent in each system,and the work flow of each business system is updated.On this basis,this paper also puts forward the application architecture of the system,and realizes the application of the camp business such as the automatic expansion of the marketing industry,the automatic analysis of the blackout,the statistical analysis of the line loss.Finally,this paper summarizes the project on the Hangzhou power grid business to bring the effectiveness of the work. |