In this paper,through the relevant professional knowledge to sort out the summary,for the current project in the progress of the lack of management work to SH garbage power plant construction projects as an example,the use of relevant ways to enhance the project management objectives,and through the progress of the project Management of the relevant theory,a waste power plant in FQ City,a comprehensive analysis of the project,and mainly in the project schedule management,put forward the relevant improvements,so as to promote the project schedule management can be effectively carried out.This paper first analyzes the problems in the process of project progress management,such as the lack of management of engineering projects;the lack of relevant professional management personnel;irrational allocation of engineering resources;and poor supervision of the project.And then elaborated on the above issues,a waste power plant in FQ City,a number of projects focused on the introduction.In the scientific and rational use of project management at the same time,but also on the FQ A waste power plant project schedule a comprehensive study and research,from the impact of the basic elements of the progress of the project,relying on the project classification management program,making Project managers and construction workers are able to have a deep understanding of the entire project and understanding,clear their own tasks,but also to promote the task of the entire project is achieved.In the construction of the project process,through the relevant links to take a series of optimization measures to ensure the effective implementation of the project schedule to meet the project objectives and requirements.Through the specific construction situation can be seen,scientific and rational use of the project schedule control,can effectively improve the level of project management level,which can be related to other related projects play a good reference and reference.The progress management of the construction project of the garbage power plant is an extremely difficult and complicated task.Only by constantly summarizing the methods in practice,accumulating the experience,strengthening the project schedule management method,perfecting the project progress management theory and making the conclusion through practice.Can guarantee the project progress management theory can be in the garbage power plant construction project has been remarkable application,thus makes the project progress management work can be constantly improved and developed. |