A Section Of The Jing-Ha Highway Project Risk Control Research

Posted on:2018-08-25Degree:MasterType:Thesis
Country:ChinaCandidate:H W ZhangFull Text:PDF
GTID:2322330515979281Subject:Engineering
Abstract/Summary:PDF Full Text Request
As the state of the transportation infrastructure investment increased,the rapid development of China's highway,to meet the large and growing flow of people and goods movement needs.Suizhong to Shenyang section of road Jing-ha highway was built so far,traffic is growing rapidly,due to the effect of vehicle load,subgrade and natural foundation get deformation,the physical and mechanical properties of embankment construction form a large change;In addition,there may be some sections of construction quality defects during construction.These factors are to some extent affect the performance of the roadbed and ultimately reflected in the pavement structure making the roadbed,pavement structure some sections have different degrees of disease.Therefore,A section Jing-ha construction projects is urgent,the completion of the project on its risk control has a larger significance.In the construction of the entire highway,time-consuming,long duration,while the need to invest huge human,material and financial resources,as well as in the entire risk management control process needs to spend a lot of energy.Therefore,uncertainties and a large number of risks will be accompanied by the entire Beijing-Harbin high-speed construction management process,it will be the successful completion of the project,as well as the entire project in the process of capital investment and duration of a direct impact.To this end,this paper from the project risk management and control of the basic theory of research cut through the combination of theory and practice,the Beijing-Harbin high-speed A section of the construction process of the possible risk of specific analysis and discussion,and put forward The risk management,including risk identification,risk assessment and risk control,are studied in this paper so that the project can be used as a practical basis for the completion of the project.In this thesis,through the combination with practice,fully absorb the essence of risk control theory,to improve the theoretical aspects of inadequate,in the process of continuous improvement to promote China's expressway construction projects sound and fast development.
Keywords/Search Tags:A section of the Jing-Ha highway project, risk evaluation, risk control, risk decision
PDF Full Text Request
Related items