Research On Progress Management For Phase ? Dust Removal Project From Huaneng Yingkou Power Plant

Posted on:2018-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:L CaoFull Text:PDF
GTID:2322330515969516Subject:Engineering
Abstract/Summary:PDF Full Text Request
Huaneng Yingkou power plant coal-fired emission standards have been unable to meet the needs of modern social and economic development,the inevitable expansion of denitrification project to ensure the efficiency of the increase and discharge concentration decline,but also in line with national and local environmental policy constraints.Based on the actual situation and the characteristics of the project,the project progress management is optimized based on the project of the flue gas ultra-low emission project of Huaneng Yingkou Power Plant.Based on the analysis of the project of denitrification project of Huaneng Yingkou Power Plant,this paper discusses the characteristics of how to control the construction period and how to control the progress of the project.As the dust renovation project has a large investment,large amount of engineering and long duration,which for the want to carry out the transformation of the power plant is a big investment.How to control the progress of reasonable,in the quality and quantity,safe and feasible,and without increasing the cost of construction under the premise of minimizing the duration has become the majority of the current power plant efforts to study the problem.In this paper,the status quo and problems of the progress management of power plant dust removal project are analyzed,and the problems of design change,the progress of schedule planning,the adjustment and control of the progress plan and the supervision problem are put forward.On this basis,we in-depth excavate the causes of power plant dust project progress management problems in the causes of the above four aspects of the source of the problem,summed up the impact of such factors.Based on the premise of the progress of the project management of the power plant dust removal project,the design scheme of the retrofit schedule of the demolition project of Huaneng Yingkou Power Plant is further proposed.The project progress of the objectives of the progress of the design optimization and optimizationof project progress control methods for a new design and summary,in order to achieve shortening and resource conservation.The project path management is optimized by the method of project management,and the key path method,Gantt chart,task decomposition and scheduling schedule are applied to project management.Finally,the paper puts forward some concrete suggestions on the progress of the demolition project of Huaneng Yingkou Power Plant.The project planning and control are optimized and perfected,and the key path analysis method is used to realize the project duration.The project management process is carried out smoothly and the project management effect is carried out smoothly.Evaluation.
Keywords/Search Tags:Dust collector, Project management, Critical path method
PDF Full Text Request
Related items