| Schedule management is an important component of the nine research fields of project management.The result of schedule management directly determines the time of completion of the project,and directly determines the overall quality of the project.The importance of schedule management as the three element of project management is self-evident.The progress of the project management work of enterprises,is a comprehensive decision-making quality,cost,personnel and other resources constraints,so using scientific and effective project management tools become the most wise choice of project management schedule management and optimization decision.The research on schedule management optimization of engineering project aims at ensuring the completion of the project on time,ensuring the quality,reducing the cost and optimizing the management of the project.The first chapter by the research of housing construction project schedule management and optimization of kimje placement in project management software-Microsoft Project,the main research contents are as follows:firstly,combined with the industry situation and enterprises to carry out the description of the background,and then introduced the theoretical and practical significance.On the basis of combing and summarizing the domestic and foreign literatures,a detailed review and classification of domestic and foreign research are made.The second chapter is the introduction of theory and method.The first chapter of the project,project management,schedule management and define the concept,the content and management factors affect the progress of project management,and software of schedule management was analyzed;the third chapter focuses on the basic situation of the project,gold dike construction contents,organization structure and foundation of the resource allocation in detail provide project,paving the way for carrying out schedule management;the fourth chapter is the research on schedule management and optimization of the key section-Gold dike project.This chapter in accordance with the requirements and schedule management stages,decompose the determination and logic relation of work structure in detail,in accordance with the critical path schedule optimization method for optimizing process research on jindihe project progress was studiedBased on the project management theory and the project management software Project,this paper uses the tools of project management,such as WBS,to carry out the study of the project management and optimization of the resettlement project of Jin Hu resettlement housing.Through the benefit analysis results show that the implementation of the schedule optimization,make the project than the scheduled 21 days ahead of schedule,than the contract ahead of time 5 days to complete the final acceptance,Y company to save the economic benefits of nearly 1 million 592 thousand yuan,the quality of an acceptance rate of 100%,and obtained a wide range of positive social repercussions.The research of this paper provides a complete idea for the other construction projects of Y company to maximize the project revenue,and also for the progress management and implementation of the same industry projects. |